Toggle Offcanvas
...
 
SAARC bridges tenders

SAARC bridges tenders

Get access to latest SAARC bridge flyover tenders and bids. Find business opportunities and government contracts for SAARC bridge tenders, SAARC bridge construction tenders, SAARC overpass construction tenders, bridge tenders, flyover tenders, SAARC scaffold work tenders, SAARC steel bridge work tenders, structure work tenders, platform work tenders. Find SAARC bridge tunnel bids, tenders, procurement, RFPs, RFQs, ICBs.

A bridge is a structure built to span a physical obstacle (such as a body of water, valley, road, or rail) without blocking the way underneath. It is constructed for the purpose of providing passage over the obstacle, which is usually something that is otherwise difficult or impossible to cross. There are many different designs of bridges, each serving a particular purpose and applicable to different situations. Designs of bridges vary depending on factors such as the function of the bridge, the nature of the terrain where the bridge is constructed and anchored, and the material used to make it, and the funds available to build it.

The South Asian Association for Regional Cooperation (SAARC) is the regional intergovernmental organization and geopolitical union of states in South Asia. Its member states are Afghanistan, Bangladesh, Bhutan, India, the Maldives, Nepal, Pakistan and Sri Lanka. SAARC comprises 3% of the world's area, 21% of the world's population and 4. 21% (US$3. 67 trillion) of the global economy, as of 2019. SAARC was founded in Dhaka on 8 December 1985. Its secretariat is based in Kathmandu, Nepal. The organization promotes development of economic and regional integration. It launched the South Asian Free Trade Area in 2006. SAARC maintains permanent diplomatic relations at the United Nations as an observer and has developed links with multilateral entities, including the European Union. Countries in SAARC - Bangladesh, Bhutan, India, Maldives, Nepal, Pakistan, Sri Lanka, Afghanistan.

642 Live Notices for SAARC bridges tenders

Showing 1 to 20

Repair Of Protective Work At Paler Bazar Bridge Approach Ch: 33+650Km Of Shaistaganj-Habiganj-Nabiganj-Sherpur(Auskandi)(R-240) Under Habiganj Road Division During The Year 2024-2025.
country Bangladesh
posting date17 Dec 2024
deadline06 Jan 2025
Construction Work Of 02(Two) Meter Height Retaining Wall With Slope Protection At 17Th Km (P) (Ch. 16+291 To 16+338M) Of Ramgonga Bridge Approach & Embankment Damaged Due To Flood Of Jagodishpur-Chunarughat-Shaistaganj (N 204) Road Under Road Sub-Division Shaistaganj Of Road Division Habiganj During The Year Fy- 2024-2025
country Bangladesh
posting date17 Dec 2024
deadline06 Jan 2025
Construction Of 44.02M (1X42.68M) Long P.C. Girder Bridge (Jamira Bridge) At 19Th Km. (Ch. 18+100 Km) Of Jamalpur (Madarganj)-Koyra-Mansurnagar (Kazipur)-Abdullah More (Sarishabari)-Tangail (Dhanbari) Zilla Highway (Z-4029) Under Jamalpur Road Division.
country Bangladesh
posting date17 Dec 2024
deadline16 Jan 2025
Fabricated Steel Parts For Trail Bridges Khadchakra 8 Dalit Tole Chhayadhungi Suspended Bridge, Dogrekhola Taredhunga Suspended Bridge &Amp; Mulkhola Suspended Bridge, Kalikot
country Nepal
posting date16 Dec 2024
deadline15 Jan 2025
Construction Of New Jersey Barrier At Shewta Bridge Approach Of Dhaka (Mirpur) -Utholi-Paturia National Highway (N-5) Under Manikganj Road Division During The Year 2024-2025.
country Bangladesh
posting date16 Dec 2024
deadline31 Dec 2024
Construction Of Retaining Wall At Ch. 51+575M Sewta Bridge Approach On Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur National Highway (N-5) (Manikganj Part) Under Manikganj Road Division During The Year 2024-2025.
country Bangladesh
posting date16 Dec 2024
deadline31 Dec 2024
E-Gp/02/Pmp Bridge-Culvert/Ee/Srd/Sylhet/2024-25 Periodic Maintenance Programme Construction Of 22.68M (1X21.34M) Long Rcc Girder Bridge (Chunggi Vangga Bridge) At 42Nd Km (Ch. 41+244.348 M) Of Moulvibazar-Rajnagar-Fenchuganj-Sylhet Road (N-208) Under Sylhet Road Division During The Year 2023-2024.
country Bangladesh
posting date16 Dec 2024
deadline13 Jan 2025
Construction Of 04 Nos Bridges (1) 34.88 Meter (1X33.54 M) Long P.C. Girder Bridge At 49Th Km (Ch:48+825 M), (2) 34.88 Meter (1X 33.54 M) Long P.C. Girder Bridge At 53Th Km (Ch:52+155 M), (3) 19.64 Meter (1X 18.30 M) Long Rcc Girder Bridge At 54Th.
country Bangladesh
posting date16 Dec 2024
deadline13 Jan 2025
Gpbridp-2/Bog/Adam/Br-05/24-25 Construction Of 20.00M Rcc Girder Bridge On Chhatiangram Up Office-Shaoil Hat Via Komarpur Road At Ch. 2520.00M Under Adamdighi Upazila, District: Bogura. [Road Id # 110063012]
country Bangladesh
posting date16 Dec 2024
deadline06 Jan 2025
Construction Of 283.188 M (7 X 39.634 M) Long Pc Grider Bridge At 8Th Km (Ch. 7 +892 Km, Barungka Bridge) Of Niamatpur-Tahirpur (Z-2806) Road Including Construction Of Approach Road, Rcc Drain, Concrete Slope Protection With Cc Block, Rcc Retainin.
country Bangladesh
posting date16 Dec 2024
deadline13 Jan 2025
Construction Of New Jersey Barrier At Shewta Bridge Approach Of Dhaka (Mirpur)- Utholi-Paturia National Highway (N-5) Under Manikganj Road Division During The Year 2024-2025.
country Bangladesh
posting date16 Dec 2024
deadline30 Dec 2024
Construction Of Retaining Wall At Ch. 51+575M Sewta Bridge Approach On Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur National Highway (N-5) (Manikganj Part) Under Manikganj Road Division During The Year 2024-2025.
country Bangladesh
posting date16 Dec 2024
deadline30 Dec 2024
Construction Of 22.00M Long Rcc Girder Bridge On Alowakhowa Up (Jalpaitola)-Ramnath Hat Gc Via Rampur Chowdhury Para Road At Ch. 2200.00M [Road Id: 177043008] Under Atwari Upazila, District: Panchagarh [Gddridp/Pan/Atw/Str/03]
country Bangladesh
posting date16 Dec 2024
deadline06 Jan 2025
Construction Of 28.00M Long Psc Girder Bridge On Sonahar Gazpuri Uzr-2005/Uzr At Natun Bandar Mosque Via Darar Hat Abasan Road At Ch. 475.00M [Road Id: 177345097] Under Debiganj Upazila, District: Panchagarh [Gddridp/Pan/Deb/Str/04]
country Bangladesh
posting date16 Dec 2024
deadline06 Jan 2025
Mvmt/Gai/Vrs-01 Construction Of 17.30M Long R.C.C. Slab Bridge On Purba Fulchari Notun Hat - Kheya Ghat Via Adarsa Gram Road At Ch. 685.00M ( Road Id: 132214050) Under Upazila - Fulchari, District - Gaibandha.
country Bangladesh
posting date16 Dec 2024
deadline07 Jan 2025
Safety Works On Approach Road Of Godabari Bridge At Bisamdol Of Lubhu Vdc
country Nepal
posting date14 Dec 2024
deadline29 Dec 2024
Upgrading Of Road From Fulawapur Village East Garden To Kothi River Manaura Bridge,Shuddodhan-05,Kapilbastu
country Nepal
posting date14 Dec 2024
deadline29 Dec 2024
Construction Of 40.97M. (1X39.634M) Long P.C Girder Lalpul Bridge At 1St Km (Ch 0+673 ) On Borhanuddin-Udaypur -Tazumuddin-Monpura-Shikderhat Road (Z-8905) Under Road Division Bhola During The Year 2023-24. Package No-01/E-Gp/Pmp-Bc/Bhord/23-24
country Bangladesh
posting date14 Dec 2024
deadline09 Jan 2025
Cib-2-Mym-W-54 Construction Of 170.20M Long Bridge On Taldighi-Munshirhat Road At Ch: 120M Over The Riverkongsha (Road Id:361242004) , Under Haluaghat Upazilla, District: Mymensingh. (Package No: Cib-2-Mym-W-54)
country Bangladesh
posting date13 Dec 2024
deadline12 Jan 2025
Construction Of 40.97M. (1X39.634M) Long P.C Girder Lalpul Bridge At 1St Km (Ch 0+673 ) On Borhanuddin-Udaypur -Tazumuddin-Monpura-Shikderhat Road (Z-8905) Under Road Division Bhola During The Year 2023-24.
country Bangladesh
posting date13 Dec 2024
deadline09 Jan 2025