36 Live Notices for SAARC Feasibility Study Tenders
Showing 1 to 20
Feasibility Study And Geometric Design, Sub-Soil Investigation Work, Cbr Test Of Base And Sub-Base Material And Psi Test Of Narayanpur Bridge Of Baburhat-Matlab-Pennai Road (Z-1402) At Ch.00+000 Km To 43+849 And Matlab By Pass Road (Z-1404) At Ch.00+000 Km To 2+300 Under Road Division Chandpur During The Year 2023-2024.
Feasibility Study And Geometric Design, Sub-Soil Investigation Work, Cbr Test Of Base And Sub-Base Material And Psi Test Of Narayanpur Bridge Of Baburhat-Matlab-Pennai Road (Z-1402) At Ch.00+000 Km To 43+849 And Matlab By Pass Road (Z-1404) At Ch.
Lrps-2024-9194375- Long Term Arrangement For Development Of Digital Media Content
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through The Land Pooling Project For Organized Urbanization In Janakpur Sub-Metropolitan City, The Capital Of Madhesh Province
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through The Land Pooling Project For Organized Urbanization In Biratnagar Metropolitan City, The Capital Of Koshi Province
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through The Land Pooling Project For Organized Urbanization In Birendranagar Municipality, The Capital Of Karnali Province
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through The Land Pooling Project For Organized Urbanization In Godawari Municipality, The Capital Of Sudurpaschim Province
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through The Land Pooling Project For Organized Urbanization In Pokhara Metropolitan City, The Capital Of Gandaki Province
Preparation Of Detail Project Report Including Feasibility Study Of City With Authenticity Through Land Pooling Project For Organized Urbanization In Hetaunda Sub-Metropolitan City, The Capital Of Bagmati Province
National Consultant-Scoping Study On Climate-Resilient Livelihoods And Ecosystem
Lrps-2024-9194170-Process Evaluation Study Of The Implementation Of Small Quantity Lipid Based Nutrition Supplements In Pakistan
Loan-6042 Pak: Khyber Pakhtunkhwa Cities Improvement Projects - Second Project Readiness Financing - Kpcip-Prf2-Cs-01 Consultancy Services For Feasibility Study, Preliminary Engineering Design And Preparation Of Procurement Documents For Green Public Transport In Khyber Pakhtunkhwa Cities (55107-001)
Consultancy Services Of Detailed Structural Design Of Seventy Five Bridges Of Total Length More Than 100M
Memo No: 46.02.0000.671.14.033.24. 362, Date: 29 October 2024
Rajkot Division: Conducting Feasibility Study Investigation, Detailed Survey, Preparation Of Gad And Dpr For Construction Of Rob/Rub Under Sr.Divisional Engineer(East)Rajkot S Jurisdiction.
Rajkot Division: Conducting Feasibility Study Investigation, Detailed Survey, Preparation Of Gad And Dpr For Construction Of Rob/Rub Under Divisional Engineer (West) Rajkot S Jurisdiction.
Consultancy Services For Pre-Feasibility Study On 19 State Highways To Take Up Projects Under Bot/Ppp With Viability Gap Funding (Package No. Pfs-03)
Consultancy Services For Pre-Feasibility Study On 18 State Highways To Take Up Projects Under Bot/Ppp With Viability Gap Funding (Package No. Pfs-02)
Consultancy Services For Pre-Feasibility Study On 14 State Highways To Take Up Projects Under Bot/Ppp With Viability Gap Funding (Package No. Pfs-04)
Consultancy Services For Pre-Feasibility Study On 17 State Highways To Take Up Projects Under Bot/Ppp With Viability Gap Funding (Package No. Pfs-01)
Consultancy Services For Preparation Of Detailed Project Report And Feasibility Study For Construction Of 2 Lane With Paved Shoulder ,Animal Underpasses (6 Nos) And Rob (01No.) On Nilajphata - Pauni- Adyal- Bhandara Road On Nh-247 As A Wildlife Mitig