141 Live Notices for South Asia Boilers Tenders
Showing 1 to 20
Procurement Of Spare Parts For Auxiliary Boiler And Swas System Of 450Mw Ccpp-South I&C Division Of Apscl
Supply Of Spares Parts For 2 Mw Diesel Generator, Model : Cat D - 3608, Serial No: 6Mc-548, Specification: 4 Stroke, 8 Cylinder, Inline Diesel Engine.
Supplying Of Assembling Ring At Pc Pole Mfg. Plant, Bpdb, Halishahar, Chattogram.
Supply And Application Of Insulation To Boiler, Gas Filter, Converter And Storage Tanks At Sap/Cna Plant,At Rcf Trombay Unit:
New Service Procurement Of Dfcu Furnace Boiler Hydro Test & Liasoning With Indian Boiler Regulation Inspection Authorities, For Opal Dahej Complex. (Contract Duration:1 Year)
Repair And Rehabilitation Works Including Fabrication, Roof Sheet Replacement And Associated Civil Works At Boiler House Area, Disaster Recovery Centre, Factory Gates And Other Miscellaneous Locations
Supply Of Acute Bend Of Size A 63.5 X 6.3 Mm Thick 210 Gr. C For Boiler Pressure Part In Unit I And Iii
Supply Of Finned Econo Mizer Coil J Bend Of Size O 44.5 X 4.5Mm Material Sa 210 Gr A1/ Radius 180/ Pitch 228 Mm For Unit- Ii Boiler
Items: Steam Boiler (Diesel Fired Quantity: 1
Multi End Reeling Machine With Electric Boiler Quantity: 1
Automatic Tilting Electric Rice Boiler 250 Ltr,Meat Mincing Machine 20 Kg Cap,Double Deep Fat Fryer Quantity: 38
Pre-Dispatch Inspection And Supply Of Boiler Suits Quantity: 100
Biennial Maintenance Contract For The Jobs For Boiler And Aux Running Daily Maintenance Under Bm Department Of Stg -I
Contract For Inspection Maintenance Of Nh3 Waste Heat Boiler E-1801
Inspection Of Rg Boiler, Secondary Reformer, Auxiliary Boiler Tubes, Start Up Furnace Coil, Waste Heat Recovery Unit Coils, Auxiliary Fire Super Heater And High Pressure, High Temperature Pipe Line And Static Equipments Of Synthesis And Reformation S
Repair And Overhauling Service - Overhauling Of Boiler And Auxiliaries; Overhauling Of Boiler And A Quantity: 1
Inspection Of Rg Boiler, Secondary Reformer, Auxiliary Boiler Tubes, Start Up Furnace Coil, Waste Heat Recovery Unit Coils, Auxiliary Fire Super Heater And High Pressure, High Temperature Pipe Line And Static Equipments Of Synthesis And Reformation
White Cotton Boiler Suit Size Small,White Cotton Boiler Suit Size Medium,White Cotton Boiler Suit S Quantity: 35000
Daily Round The Clock Routine Maintenance Of Both Boilers Routine Maintenance Of Hp Lp Valves And Safety Valves And Break Down Maintenance Of Pressure Parts Hp Lp Valves And Safety Valves Of Unit 8 And 9 Dtps Kasimpur For A Period Of 16 Months
Strengthening Of Old Boiler House
Building