15 Live Notices for South Asia Feasibility Study Tenders
Showing 1 to 15
Feasibility Study Of Decentralized Wastewater Treatment System (Dewats) In Lalitpur-29
Proposal For Conducting Feasibility Study And Preparation Of Dpr For Lc Elimination Works At 181 Lcs Of Bza, Gnt, Gtl, Hyb &Amp Ned Divisions.
Proposal For Conducting Feasibility Study And Preparation Of Dpr For Lc Elimination Works At 181 Lcs Of Bza, Gnt, Gtl, H.
Feasibility Study For Construction Of Rub/Low Cost Rob/Rob In Lieu Of Level Crossings (Total-30 Lc Gates) In Jhansi-Khai.
Consultancy Services For Preparation Of Feasibility Study And Detailed Project Report Including Land Acquisition And Other Statutory Clearances For Construction Of Rob And Its Approaches At Km 54 Sahid Chowk Jainagar On Nh 527B In The State Of Bihar
The Work For Undertaking Feasibility Study, Detailed Project Report (Dpr) Preparation Work, Detailed Design Including Bid Management In Connection With Elimination Of Level Crossings By Construction Of Grade Separators/Merger/ Di Of Roads Etc On Central Railway.
The Work For Undertaking Feasibility Study, Detailed Project Report (Dpr) Preparation Work, Detailed Design Including B.
Custom Bid For Services - Feasibility Study Of Rain Water Harvesting Rwh At Bpcl Bina Refinery Quantity: 1
Rfp - Hiring Of Agency/ Organization For Carrying Out The Technical & Financial Feasibility Study For Operations Of Multi- Specialty Hospital
Custom Bid For Services - Bd Cont 110 Feasibility Study Of Toluene Extraction Unit Project At Panip Quantity: 1
Feasibility Study Survey And Preparation Of Dpr For Construction Of Rub/Rob In Lieu Of Lcs For 35 Lcs In Agra Division O.
Consultancy Services For Pre-Feasibility Study On 14 State Highways To Take Up Projects Under Bot/Ppp With Viability Gap Funding (Package No. Pfs-04)
Request For Qualification And Proposal For Survey, Feasibility Study, Dpr, Hydraulic Design And Estimate Of Augmentation Of Water Supply Scheme From Existing 50 Mld To 90 Mld At Sanand - Ii Gidc.
Request For Qualification And Proposal For Survey, Feasibility Study , Dpr, Hydraulic Design And Estimate Of New Infrastructure For New Water Supply Line For 50 Mld From Source To Sanand-Ii Gidc And Khoraj Gidc.
Consultancy Services For Carrying Out Feasibility Study, Preparation Of Detailed Project Report For Geological Investigation Of Slope Stabilisation/Slope Mitigation Between Km 1.900 To Km 8.780, Km 27.00 To Km 27.150 And Km 35.500 To Km 35.650 On San