4535 Live Notices for South Asia Installation Work Tenders
Showing 1 to 20
SUPPLY, INSTALLATION, MIGRATION, IMPLEMENTATION & COMMISSIONING OF FINACLE 10.2.18 CORE BANKING SYSTEM HARDWARE AND SOFTWARE
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FIRE PROTECTION & DETECTION SYSTEM
providing for construction of the surrounding of the new open site and the transfer and re-installation of the tower and the related equipment
Development Works For The Road That Starts From Rajoshik Square In Front Of Hotel Intercontinental To Intersection Of Hare Road (Balti Fountain) In Ward No-19 Of Zone-01 Under Dhaka South City Corporation.
Dismantling, Carrying, Installation, And Testing & Commissioning Of 400/230 Kv 750 Mva 3-Phase Transformer (From Gopalgonj To Meghnaghat) And Associated Switchgear Equipment.27.21.0000.421.14.815.24.148; Date: 17.11.2024
Supply, Delivery, Installation, Wiring, Testing &Amp; Commissioning Of Main Panel Board At Head-Office Building
Installation of Borewell and Pumping at Changyul
Supply, Installation, Commissioning, Operation And Maintenance Of A Real-Time Web-Based Toll Collection System Of Rustompur Toll Plaza At 193Th Km Of Dhaka (Katchpur)-Bhairab-Jogodishpur-Shaistaganj-Sylhet-Tamabil-Jaflong (N-2) Road Under Road Division, Habiganj Of Road Circle, Moulvibazar For 3 (Three) Years.
Major Maintenance Of Kaharol Urc
Construction Of Residential Flat Building For Low & Middle Income Group Of People At Section-16,Mirpur,Dhaka (Sub-Head: Providing, Installation, Testing & Commissioning Of 06 Nos, 1000 Kg,13-Passenger,14-Stops Bed Lift & 12 Nos 800 Kg,.
Construction Of One Storied Semi- Paka (Steel Structure) Store At Khulna Under Wzpdcl.
Supply, Installation And Commissioning Of Desktop, Laptop And Computer Accessories For Ibas++ Scheme.
Supply, Installation, Commissioning And Testing Of Patch Management Software With Related Support Services For Ibas++ Scheme.
Supply, Installation And Commissioning Of Application Server And Server Rack With Related Services For Ibas++ Scheme.
Supply, Installation & Commissioning Of Fire Protection System For Utility Building Under The Project Of "Development Of Bangladesh University Of Professionals (2Nd Revised)"
Installation Of 48 Nos ( 36 Rahainpur12, Kalmegha12, Kakchira=12 ) (12 Kathaltali=04, Nachnapara=08 ) Deep Tube Well (Of Average Depth 305 -168 Meter) With No.6 Hand Pump (38Mm Dia) In Patharghata Upazila Under Safe Water Supply Through Out The Co.
Pswsc-2270 Installation Of 48 Nos Deep Tube Well (Of Average Depth 330 Meter) With No.6 Hand Pump (38Mm Dia) In Bamna Upazila Under Safe Water Supply Through Out The Country (Pswsc) Project Of Department Of Public Health Engineering (Dphe)Barguna District (Package No-Pswsc-2270)
Installation Of 84 Nos Deep Tube Well (Of Average Depth 330 Meter) With No.6 Hand Pump (38Mm Dia) In Taltali Upazila Under Safe Water Supply Through Out The Country (Pswsc) Project Of Department Of Public Health Engineering (Dphe)Barguna District (Package No-Pswsc-2269)
Installation Of 84 Nos Deep Tube Well (Of Average Depth 330 Meter) With No.6 Hand Pump (38Mm Dia) In Betagi Upazila Under Safe Water Supply Through Out The Country (Pswsc) Project Of Department Of Public Health Engineering (Dphe)Barguna District (Package No-Pswsc-2268)
Installation Of 84 Nos Deep Tube Well (Of Average Depth 335 Meter) With No.6 Hand Pump (38Mm Dia) In Amtali Upazila Under Safe Water Supply Through Out The Country (Pswsc) Project Of Department Of Public Health Engineering (Dphe)Barguna District (Package No-Pswsc-2267)