443 Live Notices for South East Asia Cables Tenders
Showing 1 to 20
Buy And Install The Heating Cable Of Warming Blanket System For Bangpak-C1 Heat Power Plants (Bpk-C1).
10 320891647 CONTROL ASSEMBLY,PUSH-PULL:GEAR SHIFT X 13 MM H),WITH 2 SELF LOCK NUT,2 PLAIN WASHER & 2 SCREW CAP 5 MM THD X 20 FAS TENER LG AND CABLE-GEAR SHIFTER (3325 MM LG,HOLE SIZE OF 8 MM DIAMETER AT ONE END,ATTACHED WITH 6 MM THD NUT AT THE OTHER END) 129 MM PROTRUDING WIRE LENGTH,STEEL WIRE WIT EA 1
10 320891647 CONTROL ASSEMBLY,PUSH-PULL:GEAR SHIFT X 13 MM H),WITH 2 SELF LOCK NUT,2 PLAIN WASHER & 2 SCREW CAP 5 MM THD X 20 FAS TENER LG AND CABLE-GEAR SHIFTER (3325 MM LG,HOLE SIZE OF 8 MM DIAMETER AT ONE END,ATTACHED WITH 6 MM THD NUT AT THE OTHER END) 129 MM PROTRUDING WIRE LENGTH,STEEL WIRE WIT EA 120 320894174 TENSIONER PULLEY ASSY:ALTERNATOR DR OVERALL HEIGHT:109.0 MILLIMETERS NOMINAL PART NAME ASSIGNED BY CONTROLLING AGENCY:DYNAMIC TENSIONER SPECIAL FEATURES:70 MM OUTSIDE DIAMETER,RUBBER AND STEEL; EA 1
10 121712437 BOOT,DUST AND MOISTURE SEAL:PLASTIC BODY STYLE DESIGNATOR:THRU-HOLE;OVERALL HEIGHT:36.8 MILLIMETERS NOMINAL;BASE INSIDE DIAMETER:50.0 MILLIMETERS NOMINAL;OPENING INSIDE DIAMETER:23.0 MI LLIMETERS NOMINAL;MATERIAL:BODY PLASTIC; EA 120 123159432 BALL JOINT:METALLIC STL & PLASTIC SPECIAL FEATURES: WITH LMAG-SPECIAL GREASE FILLED; SOCKET END THREAD DIRECTION: RIGHT-HAND; SOCKET END THREAD SIZE AND SERIES/TYPE DESIGNATOR: 8,0X1,25 ISO M; SOCKET END THREAD LOCATION: INTERNAL; SOCKET END CONNECTION THREAD PROVISION: THREADED; BALL EN EA 130 320344318 ACCELERATOR CABLE: ACCELERATOR CABLE: EA 140 121219957 PUMP,FUEL,CAM ACTUATED: EA 450 123113981 ADAPTER,STRT,TUBE TO BOSS:28.5 MM O/A LG MATERIAL:OVERALL COPPER ALLOY;CONNECTION TYPE:1ST END UNTHREADED EXTERNA L TUBE 2ND END THREADED EXTERNAL BOSS;THREAD SERIES DESIGNATOR:2ND END I SO METRIC FINE;NOMINAL THREAD SIZE:2ND END 10.0 MILLIMETERS;THREAD PITCH IN MILLIMETERS:2ND END 1.0;NOMINAL EA 1
Buy And Install Electrical Cables With Assembly Equipment The Office Of The Construction Project Management Office Suvarnabhumi Airport
Buy And Install Electrical Cables With Assembly Equipment The Office Of The Construction Project Management Office Suvarnabhumi Airport
Bidding Package 050905_Đtrr_Vtnet_Xl2024: Investment In Construction Of Infrastructure Expansion Of The Underground Fiber Optic Cable Network In 2024 In Thai Nguyen
Package No. 160933_Đtrr_Vtnet_Xl2024: Investment In Construction Of Infrastructure To Expand The Underground Optical Cable Network In 2024 In Hai Duong
04-2025: Construction
Bidding Package 09-1-Xl-Dtxd 2023: Construction And Installation Of New Constructions Of 2 22Kv Underground Cables From 110Kv Tba Thu Le Park To C2 Lang Ha Tba And Go To Lang Trung Petroleum Tb
Replacement Of Network Cables For Ib Block B And C For Yr2025.
Supply Of Ship Spares
11-2025 Ftel Pmbmn Planning Cable Lines To Moc Bai Station 2 & Construction Of Underground Fiber Optic Cable To The Cambodia Border
Package 03/HH-CAP: Supply of medium and low voltage power cables
Package 1: Supply Aluminum Cable Twisted After Customer Meter
Announcement Of The Bidding For The Purchase Of Heart Cables To Help Support The Work Of The Balloon Iabp.
Price Examination, Work, Control System, Control And Test The Installation Of The Power Cable From Lcus No.2 To The Office Building Within The Northeast Operations Operations Area. Khon Kaen High Voltage Station 1 (Job No. Rts2-01-S08) Price Examination No. 1000241644
10 320891647 CONTROL ASSEMBLY,PUSH-PULL:GEAR SHIFT X 13 MM H),WITH 2 SELF LOCK NUT,2 PLAIN WASHER & 2 SCREW CAP 5 MM THD X 20 FAS TENER LG AND CABLE-GEAR SHIFTER (3325 MM LG,HOLE SIZE OF 8 MM DIAMETER AT ONE END,ATTACHED WITH 6 MM THD NUT AT THE OTHER END) 129 MM PROTRUDING WIRE LENGTH,STEEL WIRE WIT EA 120 320891648 COVER,BATTERY:BATTERY TERMINAL COVER OVERALL WIDTH:67.0 MILLIMETERS NOMINAL OVERALL HEIGHT:54.0 MILLIMETERS NOMINAL PART NAME ASSIGNED BY CONTROLLING AGENCY:BATTERY TERMINAL COVER;SPECIAL FEATURES:BASE CIRCLE OF 28 MM DIAMETER; EA 2430 320913355 LAMP UNIT,VEH:ASSEMBLY STOP TAIL LAMP SPECIAL FEATURES:ASSEMBLY STOP TAIL LAMP EA 440 320913356 LIGHT,INDICATOR:ASSY REAR INDICATOR LAMP SPECIAL FEATURES:ASSEMBLY REAR INDICATOR LAMP EA 4
Hire To Repair The Surface Of The C D -Line On The Way To Drive The K Cable To The M And Drive The B Cable On The South At Don Mueang Airport.
Hire To Repair The Surface Of The C D -Line On The Way To Drive The K Cable To The M And Drive The B Cable On The South At Don Mueang Airport.