166 Live Notices for South East Asia Feasibility Study Tenders
Showing 1 to 20
Consulting On Feasibility Study Report
Plan For Selecting Contractors For Some Packages In The Preparation Of The Feasibility Study Report To Supplement The Project: Renovation And Upgrading Of Routes Dh.61A, Dh.67A; Section From National Highway 39 To Dh.65, Hung Ha District (Phase 2)
Approval Of Outline, Tasks, Technical Plan, Survey Estimate - Preparation Of Feasibility Study Report And Contractor Selection Plan For The Project: Repairing Damaged Roadbed And Surface; Reinforcing Roadside; Repairing Drainage System And Completing Traffic Safety System, Section Km209 - Km212+500, National Highway 55, Lam Dong Province
On Approving The Outline Of The Consulting Work For Survey, Preparation Of Feasibility Study Report And Plan For Selecting Contractors For Consulting Work To Examine The Cost Estimate For The Preparation Of Feasibility Study Report In The Stage Of Project Adjustment And Supplementation
Approve The Cost Estimates For Construction Investment Consulting And Contractor Selection Plan For The Feasibility Study Report Preparation Stage And Project Adjustment And Supplementation Phase.
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Bpc_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Binh Phuoc
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Hbh_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Hoa Binh
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Dtp_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Dong Thap
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Dni_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Dong Nai
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Bdg_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Binh Duong
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Cto_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Can Tho
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Cmu_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Ca Mau
Regarding The Approval Of The Contractor Selection Plan For Package No. 280301_Cđtrg_Bte_Tv2024: Consulting On The Preparation Of A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Ben Tre
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Bnh_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Bac Ninh
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Bkn_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Bac Kan
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Bgg_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In Bac Giang
On Approving The Contractor Selection Plan For Package No. 280301_Cđtrg_Agg_Tv2024: Consulting On Preparing A Feasibility Study Report: Project To Upgrade The Power System For Bts Station In 2024 In An Giang
Construction Investment Costs In The Investment Preparation Phase (The Phase Of Preparing The Feasibility Study Report) Component Project No. 3: Centralized Rural Water Supply Works In Bac Lieu Province (The Counterpart Part Of The Province) Under The Project Of Water Storage Works And Domestic Water Supply Systems In Water-Scarce Areas And Areas Affected By Saltwater Intrusion
Plan To Select Contractors For The Consulting Package To Survey And Prepare And Adjust The Feasibility Study Report For The Project: Renovation And Upgrading Of Irrigation Works Of Tay Bac Irrigation One Member Co., Ltd.
Approval Of The Supplementary Plan For Contractor Selection In The Investment Preparation Phase (Feasibility Study Report Preparation Step) For Component Project 1: Construction Of The City'S Ring Road 2, Section From Phu Huu Bridge To Vo Nguyen Giap Street, Thu Duc City