228 Live Notices for South East Asia Water Treatment Tenders
Showing 1 to 20
Bidding For Preventive Maintenance Of Machinery, Water Supply System And Wastewater Treatment System At Suvarnabhumi Airport, 1 Project, By Electronic Bidding (E-Bidding)
Bidding For Preventive Maintenance Of Machinery, Water Supply System And Wastewater Treatment System At Suvarnabhumi Airport, 1 Job, By Electronic Bidding (E-Bidding)
FILTER REPLACEMENT WORKS (NOZZLES AND FILTER MEDIA) FOR FILTER TANK AT BUKIT BARUN WATER TREATMENT PLANT STAGE 7, TUTONG
Package No. 04: Dn15 Water Meter
11Hh-Sxkd-2024: Providing Materials For Maintenance And Repair Of Measurement, Control And Information Technology Systems
Term Contract For The Maintenance Of Headworks, Reservoirs, High Level Tanks, Raw Water Intakes, Booster Stations, Water Storage Ponds And Water Treatment Plants Of Rural Water Supply Department At Betong, Spaoh, Debak, Pusa, Beladin And Maludam, Betong Division For The Year 2025-2027
Term Contract For The Maintenance Of Headworks, Reservoirs, High Level Tanks, Raw Water Intakes, Booster Stations And Water Treatment Plants Of Rural Water Supply Department At Saratok, Roban And Kabong, Betong Division For The Year 2025-2027
Collection, Transportation And Treatment Of Sludge (Phase 1)
Supply and replace chemical pumps, switchboards and air blowers for Bukit Barun Water Treatment Plant at levels 4 and 5
132KV BULK SUPPLY TO SUNGAI RASAU WATER TREATMENT PLANT (WTP) IN KUALA LANGAT, SELANGOR DARUL EHSAN GD2445: SC LILO 132KV OHL EXISTING OLPT-CBPS/TPGR INTO CUSTOMER SUBSTATION (INTERIM SUPPLY)
Package No. 02 (Purchase Of Goods): Supply And Installation Of Medical And Office Equipment
Package No. 02 (Procurement Of Goods): Supply And Installation Of Medical Equipment And Facilities.
Unscheduled / Ad-Hoc Servicing and Breakdown Maintenance for Raw Water Pump, Associated Mechanical and Electrical Accessories for Batu Kitang Water Treatment Plant I, III and IV on "As and When Required" for One (1) Year Period
Supply and Replacement of Chemical Pumps, Switchboards and Air Blowers For Bukit Water Treatment Plant at Stages 4 and 5
To Transport Chemicals For Water Treatment From Sinarubai And Tasek Stores To All Water Treatment Plants In Negara Brunei Darussalam (Fsr) 2025
Supply And Install Screen Control Cables For Existing Pump Control Panels In Bukit Barun Water Treatment Plant
Package No. 12: Design Review Of Construction Drawings - Estimates Of Remaining Items Of The Project
Contractor Selection Plan For Component Project No. 1: Ho Khe Lake And Cha Mai Lake Under The Ho Khe, Mo O, Cha Mai Reservoir Cluster Project
WORKS REPLACEMENT OF FENCE DOORS AND 'CHAIN LINK' TYPE FENCES AS WELL AS DRAIN REPAIR WORKS AT Simpang Renggam Water Treatment Plant, KLUANG, JOHOR.
Purchase And Install Fume Scrubber In The Water Treatment System Of Bang Pakong Combined Cycle Power Plant, Unit 5