119 Live Notices for Southern Europe Energy Efficiency Tenders
Showing 1 to 20
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.
Services Contract For The Technical Health And Health Coordination Of The Works Rehabilitation And Improvement Of The Energy Efficiency Of The Civic Center Of Sant Adrià De Besòs - La Mina.
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.
Improves The Efficiency Of Water And Energy Resources In La Ermita
Energy Efficiency Works At Coslada Hospital And Maintenance Of Air Conditioning Equipment
Execution Of Works Corresponding To The Project “Optimization In The Use Of Water Resources From Desalinated Water And Improvement Of Energy Efficiency Through Photovoltaic Solar Pumping And Energy Storage System For Aguas Del Almanzora, S.A. (Almería)”
Service Contract For Technical Assistance For The Management Of The Execution Of The Rehabilitation And Energy Efficiency Improvement Works Of The Cap Amadeu Torner Building In L'Hospitalet De Llobregat. Code: Cap-22238, Included In The Public Building Rehabilitation Promotion Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan – Funded By The Eu. Next Generation Eu
Energy Efficiency And Air Conditioning Measures - Joane School Center
Improve Energy Efficiency, The Building Envelope And The Incorporation Of Insulation. In The Vertical Elements Of The Envelope, The Construction Solution Adopted Is Always The Same, To Create An External Thermal Insulation System (Sate) In The Opaque Enclosures Of The Main Building. Its Thickness Is 8, 10 Or 12 Cm Depending On The Case. In The Gaps Of The Openings, The Thickness Of The Insulation Is Reduced In Order To Be Able To Stay Within The Thickness Of The Frames Of The Carpentry And Thus Eliminate The Thermal Bridge In Jambs, Lintel And Sill. Regarding The Finish Of These Walls, In Most Facades A Ceramic Baseboard Is Planned To Improve Their Durability, And The Rest Of The Surface Is Solved With A Thin-Layer Organic Finish. Secondly, Regarding The Horizontal Elements, We Find Different Systems To Incorporate Insulation In The Existing Elements. In Summary, We Find Three Types Of Constructive Solution: The First When The Roof Has An Air Chamber, The Second When The Roof Is Inclined And In Direct Contact With The Outside And Finally We Have A Part Where There Is A Registerable False Ceiling But Without Insulation. In The First Case, The Insulation Is Achieved By Blowing The Necessary Thickness Of Insulation From The Upper Part Of The Roof In Order To Avoid Interference With The School. In The Second Case, The Solution Involves Adding A False Ceiling That Incorporates The Required Insulation And, In The Last, Insulation Will Be Added Above The Existing False Ceiling. There Is Also A Series Of Interventions Focused On Reducing Overheating Of The School Classrooms, Which Do Not Have Any Cooling System. In This Way, The Comfort Of Users Will Be Improved, Especially In The Hot Months. It Is Proposed To Reduce Incident Radiation Through Two Different Shading Systems.
Hiring Of A Technical Control Body For The Mission Of Stability Control And External Control Of Energy Efficiency Certifications In Four Lots.
Negotiated Procedure For The Implementation Of Works Related To The S.E.M. Project – Smart Energy Mountain –
Service Contract For Technical Assistance For The Management Of The Execution Of The Rehabilitation And Energy Efficiency Improvement Works Of The Cap Amadeu Torner Building In L'Hospitalet De Llobregat. Code: Cap-22238, Included In The Public Building Rehabilitation Promotion Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan – Funded By The Eu. Next Generation Eu
Execution Of The Work “Reduction Of Energy Demand And Improvement Of Comfort In The Main Building Of The Escola De Ponts”.
Professional Development Services In The Fields Of Public Procurement, Accounting And Finance, Labor Relations, Labor Law, Energy Efficiency, Occupational Safety, Sports And Physical Education, Fire Protection, Law On Agencies And Internal Services For The Protection Of People And Property
Execution Of The Works Contained In The "Project For The Works Of Installation Of Pv For Self-Consumption Without Surplus For The Cr Del Páramo Bajo De León And Zamora In Villamañán (León).
Execution Of Works Corresponding To The Project “Optimization In The Use Of Water Resources From Desalinated Water And Improvement Of Energy Efficiency Through Photovoltaic Solar Pumping And Energy Storage System For Aguas Del Almanzora, S.A. (Almería)”
Improving Energy Efficiency In The Public Lighting Network. Ez Points Renewal
Efficient Lighting Of Heritage, Consisting Of The Renovation Of The Lighting Of Representative Buildings And Monuments Of Rioja Alavesa And Improving Their Energy Efficiency In Several Municipalities Of Rioja Alavesa.
Work To Improve The Energy Efficiency Of Part Of The Son Espanyol Building At Parc Bit Within The Framework Of The Recovery, Transformation And Resilience Plan - Financed By The European Union – Next Generation Eu