30 Live Notices for Southern Europe Insulation Work Tenders
Showing 1 to 20
Works Reh.Nerg.Integral 64 Vpp Pza Windmills 1.2 And 3 Huelva
Contract Works Abit 1 Valencia Street Nº 40 And Nº 42 De Picanya. Neighborhoods
Energy Rehabilitation In The Agency Of The Agency Located In Monforte De Lemos T.M. Monforte De Lemos (Lugo), Within The Framework Of The Recovery, Transformation And Resilience (Prtr) Plan.
Contract Of Execution Works Of The Singular Project Of Clean Energy Of Játar. Lot 1: Measure 01: Reduction Of Demand And Energy Consumption In Buildings And Public Infrastructure. Lot 2: Measure 03: Renewable Thermal Generation Facilities And Heat And/Or Cold Networks.
Reform Works, Simple Repair, Conservation And Maintenance, With Guild Coordination, In The Buildings Of Lehendakaritza And Palacio De Ajuria-Enea, In Vitoria-Gasteiz.
40 Vpp Energy Rehabilitation Works Group Se-7078
The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head
40 Vpp Energy Rehabilitation Works Group Se-7078
Works On The Construction Of A New Kitchen - Phase Iii
Joint Contracting Project Writing And Execution Of The Installation Works Of Radiant Soil System In The Rehabilitation Gymnasium Of The Maz M.C.S.S. Nº 11 Located In Zaragoza
Reform Work Of The Gines Youth (Seville)
Acoustic Conditioning Of Classrooms 26, 27, 32 And 33 Of The Second And Attic Plants In The Superior Conservatory Of Music In Badajoz
Contract Works Abit 1 Valencia Street Nº 40 And Nº 42 De Picanya. Neighborhoods
40 Vpp Energy Rehabilitation Works Group Se-7078
40 Vpp Energy Rehabilitation Works Group Se-7078
Energy Reform Works Of The Alange'S Pensioner'S Home Building. Prtr / Pree 5000 Program
The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head
Additional Two (2) Teaching Call To Primary Primary School 1/2023
Provision of Reconstruction, rehabilitation or refurbishment of first set of public buildings to improve energy efficiency
Rehabilitación Of The Casa Do Contello Da Laracha