31 Live Notices for Southern Europe Iron Steel Tenders
Showing 1 to 20
Supply Of Materials For The 2024 Agricultural Employment Promotion Program And The Stable Employment Plan (Pfea-Pee 2024).
Framework Agreement For The Supply Of Hatches For The Bam Is Programme.
Supply Of Building Materials, Wood Materials, Iron Materials, Paint Materials, Paint Tools And Asphalt Materials
"Supply Of Cast Iron Water Supply Materials And Rapid Repair Saddles" Budget €185,985.62 Including 24% Vat.
T 143/24 Procurement Of Steel Pipes And Elbows
Procurement Of Medicines, Sanitary And Consumables
Cast Caps For Couplings, Closures And Hydrants
Steel Plates, Sheets And Solid Material, Lot 2: Solid Material - Steel
Framework Agreement For The Supply Of Consumables And Reagents For Wastewater Treatment Plants
Steel Profile Unp 8X12000, Č.0562 (7,000 Kg)
Supply Of Building Materials
Cast And Iron Plumbing Materials
Procurement And Transportation Of Basic Construction Materials (Cement, Separated Sand, Gravel, Tampon, Stone And Concrete Iron)
Use Of Mountain Land And Pastures, Corresponding To The 2024-2027 Campaigns, Within The Scope Of The Integral Management Plan For The Public Mountains Of Sierra Norte De Sevilla
Supply Of Fruits And Vegetables To Schools In The Autonomous Community Of The Canary Islands Participating In The European School Consumption Programme For Fruit And Vegetables For The 2024-2025 Academic Year, Through An Open Procedure, Subject To Harmonised Regulation And Early Processing.
Flood Protection, Emergency Minor Damage Restoration And Direct Intervention
Design, Fabrication, Installation And Necessary Testing Of The Neutron Guide Outside The Miracles Instrument Bunker
Building Material With Successive Delivery
Cast Iron Fittings And Stoppers, Hydrants, Fittings, Fittings, Air Valves And Pressure Regulators, Quick Couplings And Water Meters
The Object Of This Contract Is The Execution Of The Works For The Replacement Of The Larner Valve Núm. 1 Of The El Pasteral Catchment Located At The End Of La Cellera De Ter. The Main Actions To Be Carried Out Are The Following: • Replacement Of The Annular Larner Valve No. 1 Dn 1600, For A Globe Valve With A Ductile Cast Iron Body Of The Same Diameter And Inclined Axis. • Replacement Of Elements Upstream Of The Larner Valve: A Disassembly Cart And Gate Valve, And Downstream Of The Larner Valve: A Disassembly Cart. • Supply And Installation Of A Custody Transfer Dn1600 Flow Meter, Downstream Of The Larner Valve. Line No. 2 Of The Catchment Will Remain In Operation At All Times To Be Able To Supply The Etap Ter Plant, And In This Way Guarantee The Supply Of Water To The Municipalities Of The Distribution Network In The North Zone Of Atl. Therefore Line No. 2 Will Remain Operational At All Times, With The Exception Of The Underwater Work Required To Seal Sluice No. 1. These Underwater Works Are Essential To Be Able To Ensure That The Work Area Is Perfectly Isolated From The Waters Of The Reservoir, And Prevent Leaks Or Discharges That Could Affect The Safety Of The People Who Will Work There.