15 Live Notices for Southern Europe Irrigation Works Tenders
Showing 1 to 15
Execution Of Works By The Green Department Of The Municipality: 1. Cutting Of Native Vegetation And Removal Of Cutting Products On The Entire Surface Of The Former Kodra Camp. 2. Maintenance Of Parks, Islands And Other Common Green Spaces. 3. Rejuvenation, Crown Formation And Pruning Of Tall Trees. 4. Rejuvenation, Crown Formation And Pruning Of Low Trees. 5. Uprooting Stumps And Planting Trees On Sidewalks And Common Areas Of The Municipality. 6. Care And Cleaning Of Pine Trees, Pruning Of Cypress Trees In Groves And Sidewalks Of The Municipality 7. Maintenance Of New Rows Of Trees On The Sidewalks Of The Municipality. 8. Weeding Of Tree Shelters On The Sidewalks Of The Municipality
Execution Of The Works And Start-Up Of The "Irrigation Modernization Project In The Irrigation Community Of The Ribera Alta Del Porma (León)".
Execution Of The Works And Start-Up Of The "Irrigation Modernization Project In The Community Of Irrigators Of The Ribera Alta Del Porma (León)".
Contracting Of The Supply And Start-Up Of The Remote Control System For The Work "Hydraulic Valve Replacement Work - Meter And Remote Control System Of The Work Of The Irrigation Network Project To Improve And Modernize Irrigation In The Ccrr Of The Balbilafuente Canal (Salamanca ), Phase 1 And Phase 2".
Work Execution Contract Corresponding To The “Water Distribution Project With Photovoltaic Pumps In Palomares For The Central Board Of Water Users Of The Almanzora Valley. Irrigation Communities Of Bajo Almanzora, Vera, S.A.T. No. 2503 Of Antas And S.A.T. Agrolujo (Almería)”
Work Execution Contract Corresponding To The “On-Demand Irrigation Network Project For Sat El Grupo De Antas And Sat Climasol De Vera (Almería). Separata Sat The Antas Group”.
Work Execution Contract Corresponding To The “On-Demand Irrigation Network Project For Sat El Grupo De Antas And Sat Climasol De Vera (Almería). Separata Sat The Antas Group”.
Contrato De Ejecución De Obra Correspondiente Al “Proyecto De Red De Riego Bajo Demanda Para La Sat El Grupo De Antas Y Sat Climasol De Vera (Almería). Separata Sat El Grupo De Antas”.
Waste Management Services For The Improvement Work Of The Tierras De Almería Irrigation Community, T.M. El Ejido (Almería), In The Recovery, Transformation And Resilience Plan, Financed By The European Union- Netx Generationeu
Basic And Execution Project For The Regeneration Of Avenida Rio Nalón In Los Alcázares.
Construction Of Connections For The Irrigation System
88 Kw Self-Consumption Photovoltaic Installation Project To Supply The Pozo De Santiago De Yecla Irrigation Community
The Contractual Object Is Defined In The Project Drafted By Mr. Enrique Alabort Domenech And Approved By Agreement Of The Local Government Board In An Ordinary Session Held On March 7, 2024. “Improvement Of The Mestre Miguel Buendía Green Area”
Open Procedure For The Procurement Of The Works Of: "Full Use Of The Water Stored In The Garcia Reservoir On The Left Belice River - Irrigation Distribution Works - Lifting And Distribution Of Zone Iv A - I Functional Lot - Excerpt".
Construction Of A Closed Irrigation Network In The Stylos Kamara Area Of Naousas Farm (Nea Contract)