54 Live Notices for Southern Europe Pollution Control Tenders
Showing 1 to 20
2036 - Master Plan Of The Port Of Trieste – Implementation Of The Integrated Monitoring Plan 2025-2029
The Purpose Of This Contract Is To Carry Out Monitoring Work And Advance Knowledge Of The Hydrological Regime Of Wetlands, Monitoring The Quality Of Their Waters And Biological Content, In Order To Safeguard These Ecosystems That Are An Essential Part Of The Natural Heritage, Which Remain In Flood Conditions Or With Soil Saturated With Water For Considerable Periods Of Time, And To Have A Useful And Necessary Tool To Address The Work And Objectives Planned To Be Developed In The Action Plan For The Catalogued Wetlands, Whose Characteristics Are Specified In The Particular Technical Specifications. All Of This In Accordance With The Powers Attributed To The General Directorate Of Energy Transition And Circular Economy In Promoting The Efficient And Sustainable Use Of Water And The Control And Protection Of Waters Against Pollution, And Environmental Control, Designation And Updating Of Areas Vulnerable To Water Pollution By Nitrates From Agricultural Sources, Provided For In Article 10 Of Decree 235/2023, Of September 6, Of The Governing Council, Which Establishes The Organic Structure Of The Ministry Of The Environment, Agriculture And The Interior.
Announcement Of A Repeated Tender With An Open Procedure For The Provision Of Hazardous Explosive Gas Control Services To Ships Under Repair In The Republic Of Cyprus, Through The Conclusion Of A Framework Agreement For A Duration Of Thirty-Six (36) Months With A Total Estimated Value Of Two Hundred Twenty Thousand Euros (€220,000.00), Including Deductions And Exempt Vat, Whichever Of The Two Limits (Time Or Amount) Comes First
Sampling And Analytical Determinations In The Atmospheric Environment. Years 2025-2027
Sampling And Analytical Determinations In The Atmospheric Environment. Years 2025-2027
Provision Of Hazardous Explosive Gas Control Services To Ships Under Repair In The Nk (Entry:365637)
Provision Of Hazardous Explosive Gas Control Services To Ships Under Repair In The Nk (Entry:365637)
The Purpose Is The Contracting Of The Legionellosis Control And Prevention Service To Be Carried Out At The Facilities Of Reus Desenvolupament Econòmic, S.A. (Redessa).
The Purpose Is The Contracting Of The Legionellosis Control And Prevention Service To Be Carried Out At The Facilities Of Reus Desenvolupament Econòmic, S.A. (Redessa).
Preparation And Updating Of The Inventory Of Pollutant Emissions And Greenhouse Gases Into The Atmosphere And The Energy Balance Of The Municipality Of Madrid
Preparation And Updating Of The Inventory Of Pollutant Emissions And Greenhouse Gases Into The Atmosphere And The Energy Balance Of The Municipality Of Madrid
Odorant Filling And Control Service
Odorant Filling And Control Service
Marine Pollution Response Plan
Marine Pollution Response Plan
Contracting Of The Apc Marine Pollution Control Service And Maintenance Of Anti-Pollution Resources And Equipment
Contracting Of The Apc Marine Pollution Control Service And Maintenance Of Anti-Pollution Resources And Equipment
The Purpose Of This Contract Is To Carry Out Monitoring Work And Advance Knowledge Of The Hydrological Regime Of Wetlands, Monitoring The Quality Of Their Waters And Biological Content, In Order To Safeguard These Ecosystems That Are An Essential Part Of The Natural Heritage, Which Remain In Flood Conditions Or With Soil Saturated With Water For Considerable Periods Of Time, And To Have A Useful And Necessary Tool To Address The Work And Objectives Planned To Be Developed In The Action Plan For The Catalogued Wetlands, Whose Characteristics Are Specified In The Particular Technical Specifications. All Of This In Accordance With The Powers Attributed To The General Directorate Of Energy Transition And Circular Economy In Promoting The Efficient And Sustainable Use Of Water And The Control And Protection Of Waters Against Pollution, And Environmental Control, Designation And Updating Of Areas Vulnerable To Water Pollution By Nitrates From Agricultural Sources, Provided For In Article 10 Of Decree 235/2023, Of September 6, Of The Governing Council, Which Establishes The Organic Structure Of The Ministry Of The Environment, Agriculture And The Interior.
The Purpose Of This Contract Is To Carry Out Monitoring Work And Advance Knowledge Of The Hydrological Regime Of Wetlands, Monitoring The Quality Of Their Waters And Biological Content, In Order To Safeguard These Ecosystems That Are An Essential Part Of The Natural Heritage, Which Remain In Flood Conditions Or With Soil Saturated With Water For Considerable Periods Of Time, And To Have A Useful And Necessary Tool To Address The Work And Objectives Planned To Be Developed In The Action Plan For The Catalogued Wetlands, Whose Characteristics Are Specified In The Particular Technical Specifications. All Of This In Accordance With The Powers Attributed To The General Directorate Of Energy Transition And Circular Economy In Promoting The Efficient And Sustainable Use Of Water And The Control And Protection Of Waters Against Pollution, And Environmental Control, Designation And Updating Of Areas Vulnerable To Water Pollution By Nitrates From Agricultural Sources, Provided For In Article 10 Of Decree 235/2023, Of September 6, Of The Governing Council, Which Establishes The Organic Structure Of The Ministry Of The Environment, Agriculture And The Interior.
Systematic Testing Of Groundwater Quality In The Water Area Of The Danube River In 2025