169 Live Notices for Southern Europe Solar Panel Tenders
Showing 1 to 20
Photovoltaic Installation In The Wwtp Of Agurain, Within The Framework Of The Recovery, Transformation And Resilience Plan, Funded By The Eu - Next Generation Eu.
Execution Work Of Photovoltaic Installation Of Self -Consumption And The Low Voltage Electrical Installation For The Community Of Irrigators Pozo Cristo Del Amparo And San Roque 100 Kw (103.68 Kwp), In The T.M Of Llocnou De Sant Jeroni And Almiserà (Valencia).
Installation Photovoltaic Plates
Shadowed And Photovoltaic Plates In The Port Of La Atunara
Supply And Installation Of Solar Photovoltaic Panels In The Car Park Les Palmeras De Calella Within The Framework Of The Pstd Calella (Prit - Next Generation)
Award The Actions Corresponding To The Photovoltaic Solar Installation Without Discharge In The City Council And Casa De La Cultura De Guarromán (Jaén). In The Object Of The Contract, In Addition, The Elaboration Of The Corresponding Work Project Is Included, Which Will Include The Health And Safety Study And The Waste Management And Legalization Study Of The Facilities.
The Works Contract Includes The Execution Of: - Building Of The Municipal Brigade - Installation Of The Elevator And Its Machinery - Installation Of The Photovoltaic Panels.
Accumulation Of Electric Power In Photovoltaic Installation In The "La Molinera" Well [Pi/2022/827]
Photovoltaic Installation Of Self -Consumption Shared With Injection To The Distribution And Compensation Network Of Surpluses, Conditioned To The Final Approval Of The 2025 Budget, Which Is Currently Subject To Public Information And The Concession Of Extension For The Execution
Hiring Of Photovoltaic Installation Connected To A Network Under Modality Of Self -Consumption In The Municipal Sports Pavilion Of Daroca (Zaragoza) Located In C/ Zaragoza, 7 In Order To Improve Its Energy Efficiency
Collective Fv Self -Cv Installation
Supply And Installation Of Solar Photovoltaic Plates In The Les Palmeres De Calella Parking In The Framework Of The Pstd Calella (Prtr - Next Generation)
Drafting Project, Execution Work And Maintenance Of Photovoltaic Installation For Self -Consumption In The Building Arazuri (00000327_001)
Ged-Rfq Supply, Delivery And Installation Of 6 Pv Powerplants In Una-Sana Canton
12/25 Procurement Of Consumables (Solar Dc Cable) For The Needs Of The Solari 5000+ Project;
Bidding Announcement Of: Social Security Informatics Management. Object: 24 -Hour Maintenance And Service Of Critical Equipment, Responsible For Maintaining Electricity Supply And Air Conditioning, At All Times, The Two Data Process Centers. File: 2024/7030.
O-Abr0008/2023 Hiring Of The Works Of Photovoltaic Installation Of Self-Consumption Without Surpluses In The Agrobiotechnology Building Of The Public University Of Navarra
Drafting Project, Execution Work And Maintenance Of Photovoltaic Installation For Self -Consumption In The Building Arazuri (00000327_001)
Drafting Project And Execution Photovoltaic Installation Work For Self -Consumpum In The Etap Tibbas (Am273268_01)
Execution Works Contract For An Outdoor Parking On The Beach Of The Pantano De Alarcon With Autonomous Classroom And Autonomous Barains T.M. From Valverde De Jucar Included In The Tourist Sustainability Plan At “Sierra Y Mancha Conquense” Of Adesiman, Subject To The Recovery, Transformation And Resilience Plan And Funded By The European Union With Nextgenneration Eu Funds.