124 Live Notices for Southern Europe Solar Tenders
Showing 1 to 20
Supply And Installation Of Solar Street Lights For 15 Areas Of The Estepona Coastal Path.
Work On A 12.50 Kw Photovoltaic Installation For Self-Consumption On The Internal Network With Surpluses At The Prudencio Guzmán Specialized Care Center (Cae), With Next Generation Financing, Charged To The Recovery Aid Fund For Transformation And Resilience (Mrr)
Supply Of Photovoltaic Modules For The Project: “Irrigation Modernisation Project In The Irrigation Community Of The Left Bank Of The Porma (León). Sectors Ii And Iii. Phase I (León)”, Within The Framework Of The Recovery, Transformation And Resilience Plan, Financed By The European Union - Nextgenerationeu, To Be Awarded By Simplified Open Procedure.
2024/Cp/018 - Contracts For The Renovation Of Frames, Internal Insulation And Solar Protection - Esce|Ese
Installation Of Photovoltaic Stations
Industrial Installation Works Pending Execution Due To Culpable Termination Of The Contract Of The Previous Contractor, Necessary For The Transformation Of The Maspalomas Market
Leasing Of Land For Parking Purposes
Mixed Contract For The Supply, Installation And Operation Of Photovoltaic Solar Installations In Several Buildings Of The University Of Valladolid, With Acquisition Of Ownership At The End Of The Contractual Period
Work On A 87.50 Kw Photovoltaic Installation For Self-Consumption On The Internal Network With Surpluses At The Vecindario Specialized Care Center (Cae), With “Next Generation” Financing, Charged To The Recovery Aid Fund For Transformation And Resilience (Mrr)
Supply And Installation Of A Photovoltaic Solar System For The Uarkape Fronton In Arrasate
Mixed Contract For The Supply, Installation And Operation Of Photovoltaic Solar Installations In Several Buildings Of The University Of Valladolid, With Acquisition Of Ownership At The End Of The Contractual Period
Photovoltaic Installation For Self-Consumption In A Shared Regime Of 20Kw With Surpluses And Simplified Compensation At The School In The Municipality Of Alfara De Carles
Execution Of The Photovoltaic Installation Work At The Vilanova Del Camí Municipal Market.
1)Procurement of consumable electrical materials, Solari 5000+ ,2)Procurement of mechanical and construction materials (12MW), Solar 5000+
Execution Of Works To Install Photovoltaic Solar Panels And Renovate Showers At The Segorbe Municipal Aquatic Sports Centre, Defined And Detailed In The Technical Project
Solar Energy Supply
Photovoltaic Solar Installation Of 750 Kwn On Land Connected To The Grid For Shared Self-Consumption
The Object Of This Contract Is The Work Of Photovoltaic Electrical Installation With A Peak Installed Power Of 37.4 Kw And A Nominal Power In Inverter Of 40Kw For Self-Consumption With Surpluses Connected To The Existing Low Voltage Internal Network In The Axerquía Theater.
Work On An 80 Kw Photovoltaic Installation For Self-Consumption On The Interior Grid Without Surplus On The West Roof Of The Insular University Hospital Of Gran Canaria, With “Next Generation” Financing, Charged To The Recovery Aid Fund For Transformation And Resilience (Mrr)
Work On An 80 Kw Photovoltaic Installation For Self-Consumption On The Internal Grid Without Surpluses At The Maternal And Child University Hospital Of Gran Canaria (Huimi), With “Next Generation” Financing, Charged To The Recovery Aid Fund For Transformation And Resilience (Mrr)