19 Live Notices for Southern Europe Structural Works Tenders
Showing 1 to 19
Concrete Repair Works At The Melilla Wwtp: Digesters, Secondary Decanters, Chlorination Chamber And 2Nd Stage Biological Reactors.
Rehabilitation Of The Municipal Building In Ubierna (Burgos)
Ct2278/2024 - Works - Tender For The Construction, Finishes, Mech., Electrical And Landscaping Works In An Energy Efficient Manner, With Reduced Environmental Impact For The Farmer’S Market, Ta’ Qali
The Purpose Of This Contract Is To Carry Out The Actions Included In The Reference Project. The Object Of The Project Is The Structural Consolidation And Waterproofing Of The Upper Level Of Ship E Of The Sallares Deu Complex And The Development Of The Access Area To This Ship. The Location Of The Performance Corresponds To Carrer De Cellers, No. 69 And Jacint Verdaguer, No. 51 Of Sabadell. The Actions To Be Carried Out Involve The Comprehensive Rehabilitation Of The Building In Terms Of: 1_Improvement Of The Thermal Envelope Of The Building: Preliminary Work And Demolition Necessary For The Rehabilitation Will Be Carried Out. The Complex'S Facades Will Be Repaired And Consolidated, Restoring Lost Volumes And Weathered Bricks. The Structural Consolidation Will Be Based On The Dismantling Of The Affected Facade Sections By Removing Bricks, The Stitching Of Cracks Using Stainless Steel Staples, And The Replacement With Lime Mortar Of Manual Bricks Of The Same Characteristics As The Existing Ones. The Roofs Of The Gabled Naves Are Formed By A Light Roof With An Arabic Tile Finish. This Will Consist Of The Finish Of Recovery Arabic Tiles Mounted On Double Wooden Slats. A Breathable Waterproof Sheet With An Outer Layer Of Polypropylene Fiber And An Inner Layer Of Microperforated Polypropylene Film Reinforced With Polyethylene Mesh Will Be Placed Between The Raking. The Set Will Be Mounted On Wooden Sandwich Panels. It Is Proposed To Replace All The Carpentry With New Aluminum Ones With A Break In The Thermal Bridge. 2_ Improvement Of Sustainability: Improvement Of The Building'S Sanitation System. 3_Improving Accessibility: Actions Aimed At Universal Accessibility To The Building. 4_Conservation Of The Building Rehabilitation And Structural Reinforcement
European Open Procedure Competition For The Execution Of Seismic Adaptation And Energy Efficiency Works At The State Agricultural Technical Institute “A. Tosi” In Codogno – Financed By The European Union Next Generation Eu (M4C1I3.3).
Contract For Energy Production Based On Renewable Energy Sources For Iscte Self-Consumption – Measures Eri 1, Eri 2 And Eri 3 Of The Eco.Ap.2030 Plan, Under The Application To Prr – Notice No.
Service For The Work Of Drafting The Basic Project And Execution Of The Structural Rehabilitation Of The C.E.I.P. Domingo Lozano.
Works To Cover A Kiosk-Bar In Parque Tierno Galván, To Be Awarded By A Super-Simplified Open Procedure.
Drafting Of A Technical Project And Carrying Out The Construction Management And Execution Management Of The Project.
Consulting And Technical Assistance Complementary To The Execution Of Works
Rfi S.P.A. Qualification Systems
The Purpose Of This Contract Is To Implement A System To Monitor The Evolution Of The Structural Resistance Of The Ptll – Cota 250 Artery Pipe, In Real Time, Using The Acoustic Fiber Optic (Hereinafter Afo) Monitoring System. The Work Basically Consists Of: -Study Of Implementation Of The Afo System With Field Visits. -Installation Of The 8-Fiber Optical Fiber Inside The Pipe Through Manholes, Boxes Or Keyholes. -Installation Of Auxiliary Elements To Fix The Fo And Connection Boxes, As Well As Tubes In The Elbows To Protect The Fiber From Possible Breakage Or Tears. -Installation Of The Software Unit That Will Capture And Analyze The Acoustic Signals Of The Afo System. -In-Service Tests After Each Installation Phase And Once All Parts Have Been Completed.
Static Reinforcement Of Primary School Of Mytilinai
Mixed Contract For Drafting The Project, Execution And Management Of The Works For The Installation Of An Elevator In Arroabea. (Zestoa)
Mixed Contract For Drafting The Project, Execution And Management Of The Works For The Installation Of An Elevator In Arroabea. (Zestoa)
Ct2278/2024 - Works - Tender For The Construction, Finishes, Mech., Electrical And Landscaping Works In An Energy Efficient Manner, With Reduced Environmental Impact For The Farmer’S Market, Ta’ Qali
Competitive Dialogue For The Igcp, Epe Digital Transformation Contract
Works Contract "Basic Design And Execution Of Gymnasium, Energy Efficiency, Interior Carpentry, Accessibility, Bathroom And Structural Rehabilitation Of The Perputxent De Beniarrés Classroom" Work Included In The Building Plan.
Technical-Legal, Predictive And Preventive Maintenance Of The Facilities Of The Oam Palau De La Música, Congresos Y Orquesta De València Building