54 Live Notices for Southern Europe Water Tanks Tenders
Showing 1 to 20
Filiatrino Basin Irrigation Networks Utilization Dam N. Messinia
Supply And Installation Of Pressure Groups And Water Tanks At The Heliodoro Rodríguez López Stadium.
Renovation And Improvement Of The Drinking Water Supply Network At The Font De L'Arç - Municipal Deposits-Font De Fontanelles Section
Given The History Of Repairs To The Font De L’Arç High-Pressure Distribution Network Pipe And Considering That It Was Built In The 1930S, Vilada City Council Proposes To Renovate The Section Of Approximately 1,362 Meters Between The Municipal Tanks And Font De Fontanelles. This Action Will Complete The Renovation Of The Water Pipe Between The Vilada Tanks And Font De L’Arç. The Planned Pipeline Will Be Installed Along The Same Route As The Current Pipe, Generally Along Existing Roads.
Acquisition Of Drinking Water Transportation Service Using Auto Tank In The Municipality Of Odemira
Since It Has Been Detected That The Waters Of The Head Tank Of Colony Count Triple The Legal Maximum Accepted By The Current Regulation Rd 3/2023, The Need To Install A Sand Filtration System Or Other Appropriate Filtering Medium Is Detected, For Water Intakes Before It Is Distributed And Disinfected. Therefore, The Installation Of A Filtration System Is Required In Order To Adapt To The New Current Regulation.
Supply Of Maintenance And Repair Services For Electro-Mechanical Installations, Pumping Stations And Drinking Water Tanks
Open Procedure For The Awarding – Through Framework Agreement – Of Maintenance Works On Water And Sewerage Networks And Replacement/Construction Of New Networks In The Ato Polesine Territory.
Project The Purpose Of This Project Is To Define And Measure The Actions Necessary To Improve The Catchments Of The Gotarta And Les Bordes Cores, In Order To Reduce The Energy Consumption In The Water Supply To The Two Cores And, Consequently, The Emission Of Greenhouse Gases (Ghg). In The Case Of The Supply To The Center Of Gotarta, The Improvements Must Be Applied In Two Areas In Order To Guarantee The Correct Functioning Of The Network At Peak. On The One Hand, The Derivation From The Ravine Needs To Be Improved And On The Other Hand, A Section Of The Pipe That Brings Water From The Esperan Ravine To The Water Tank Needs To Be Repaired. The Catchment Located In The Viuet Ravine To Supply The Town Of Les Bordes Requires Actions To Improve The Diversion Of Water And Facilitate Its Maintenance. This Action Must Significantly Contribute To The Reduction Of Incidents In The Summer Periods That Currently Require The Support Of Cisterns. With This Objective, The Plenary Of The Pont De Suert City Council, In Session 5 Of 2024, Ordinary Held On September 26, 2024, Agreed To Approve The Project "File 02 2024 - "Mitigation And Adaptation Project In Front Of The Climate Change Of Urban Water Supply Withdrawals From The Core Of Gotarta And The Edges Of The Municipality Of Pont De Suert", Signed By Pilar Mallol Casals, Coeac Collegiate Agronomist Engineer 651, With A Basic Budget Of 82,470.00 Euros, 17,318.70 Euros Of Vat At 21% And 99,788.70 Euros In Total.
Repair Of Damage To Hot Water Boilers Of The Swimming Tank Of The National Swimming Pool
Comprehensive Maintenance Of The Facilities Of The Buildings Of The Institute Of Fiscal Studies
Declaration
Object: New Water Intake And Water Pumping Until Its Connection To The Head And Distribution Tank Of The Municipal Drinking Water Supply Network
Technical Assistance Service For The Drafting Of Sustainability Studies With The Aim Of Having Specific Solutions To Needs Detected In Atl Related To The Field Of Sustainability. These Studies Must Allow For The Inclusion Of Specific And Planned Actions In The Sustainability Plan Or In The Investment Plan, As Appropriate. Lot 1. Efficient Water Management. Includes 2 Studies: - Mapping And Reuse Of Effluents From Production Plants. - Use Of Regenerated Water In The Atl Field. Lot 2. Circular Economy. Includes 2 Studies: - Reuse Of Reagents When Cleaning Storage Tanks. - Sludge Valorization: Technical Feasibility In The Use Of Sludge For The Production Of Bricks Or Ceramic Material. Lot 3. Environmental Consulting. Includes 1 Study: - Assessment Of The Environmental Impact In Atl Studies And Construction Projects.
Contracting Of The Network Maintenance Service, Cleaning Of Tanks And Disinfection System For The Drinking Water Supply, Maintenance Of Sanitation Networks And Operation, Maintenance And Conservation Functions Of The Wwtp And Ebars No. 1 And No. 2 Of Fasnia.
Contracting Of Works For A New Supply Well In Highland
Contracting Of The Network Maintenance Service, Cleaning Of Tanks And Disinfection System For The Drinking Water Supply, Maintenance Of Sanitation Networks And Operation, Maintenance And Conservation Functions Of The Wwtp And Ebars No. 1 And No. 2 Of Fasnia.
Irrigation Sector Management Of Deya Aigialeia
PHASE 1 - Restricted procedure for the supply of ISO1C container tanks for water storage
Hygienic Cleaning Of Water Supply Tanks Of The Municipality Of Aristotelis