14 Live Notices for Southern Africa Cables Tenders
Showing 1 to 14
Tender For The Supply, Delivery And Off-Loading Of Cartridge Fire Cable Spiking And Hydraulic Cable Spiking Equipment, Accessories, And Consumables To Be Used On The Electricity Distribution Lv/Mv Network For A Period Of Three Years As And When Required
Tender For The Supply, Delivery And Off-Loading Of Cartridge Fire Cable Spiking And Hydraulic Cable Spiking Equipment, Accessories, And Consumables To Be Used On The Electricity Distribution Lv/Mv Network For A Period Of Three Years As And When Required
Maintenance Of High And Medium Voltage Underground Power Cables And Associated Equipment During A 36-Month Period
Supply And Delivery Of High Voltage Cable Insulating Fluid
Rfq-Rfq Control Cable Replacement East By 12 December 2024
Rfq Control Cable Replacement. East By- 12 December 2024
Control Cable Replacement West By 12 Dec 24
Supply, delivery and off-loading of Low Voltage (LV) Cables on an as-and-when required basis from date of award until 30 June 2027
The Provision Of Breakdown & Fault Repairs Of Mv & Lv Lines (Overhead Aerial Bundled Conductor, Bare Conductor Lines And Underground Cable Reticulation) In The Cape Coastal Cluster — Eastern Cape For The Period Of 36 Months.
Tender: 04-2024-Ctn-Infra - Appointment Of Supplier For The Supply And Delivery Of Cables On An As And When Basis For The Period Of 36 Months In The Western Cape Region
The Provision Of Breakdown & Fault Repairs Of Mv & Lv Lines (Overhead Aerial Bundled Conductor, Bare Conductor Lines And Underground Cable Reticulation) In The Cape Coastal Cluster — Eastern Cape For The Period Of 36 Months.
The Provision Of Breakdown & Fault Repairs Of Mv & Lv Lines (Overhead Aerial Bundled Conductor, Bare Conductor Lines And Underground Cable Reticulation) In The Cape Coastal Cluster — Eastern Cape For The Period Of 36 Months.
The Establishment Of An Enabling Agreement With A Maximum Panel Of 40 Contractors For The Provision Of Supervision, Labour, Equipment, Material (Except The “Big Five” Material Which Include Meters, Poles/Cross Arms, Transformers, Cable And Conductor), Transport (As It Will Be Required And Authorised) For Electrification Of New Household Connections (Above R3 000 000,00 Per Project) For A Period Of Thirty (30) Months (Twenty-Four (24) Months For Allocation Of Task Orders And Six (6) Months For The Close-Out Of Projects And Finalisation Of The Payment Process) For Distribution Division In The Kzn Operating Unit, Central East Cluster As And When Required.
The Establishment Of An Enabling Agreement With A Maximum Panel Of 40 Contractors For The Provision Of Supervision, Labour, Equipment, Material (Except The “Big Five” Material Which Include Meters, Poles/Cross Arms, Transformers, Cable And Conductor), Transport (As It Will Be Required And Authorised) For Electrification Of New Household Connections (Above R3 000 000,00 Per Project) For A Period Of Thirty (30) Months (Twenty-Four (24) Months For Allocation Of Task Orders And Six (6) Months For The Close-Out Of Projects And Finalisation Of The Payment Process) For Distribution Division In The Kzn Operating Unit, Central East Cluster As And When Required.