Toggle Offcanvas
...
 
South Asia non renewable energy tenders

South Asia non renewable energy tenders

Get access to latest South Asia non renewable energy tenders and bids. Find business opportunities and government contracts for South Asia non renewable energy tenders, South Asia power plant tenders, South Asia coal tenders, South Asia fuel tenders, South Asia natural gas tenders, South Asia petroleum tenders, nuclear energy tenders, South Asia power tenders, South Asia energy consultancy tenders, South Asia power feasibility tenders, South Asia thermal power plant tenders. Find South Asia non renewable bids, tenders, procurement, RFPs, RFQs, ICBs.

A non-renewable resource (also called a finite resource) is a natural resource that cannot be readily replaced by natural means at a pace quick enough to keep up with consumption. An example is carbon-based fossil fuels. The original organic matter, with the aid of heat and pressure, becomes a fuel such as oil or gas. Earth minerals and metal ores, fossil fuels (coal, petroleum, natural gas) and groundwater in certain aquifers are all considered non-renewable resources, though individual elements are always conserved.

South Asia is the southern region of Asia, which is defined in both geographical and ethno-cultural terms. The region consists of the countries of Afghanistan, Bangladesh, Bhutan, India, Maldives, Nepal, Pakistan, and Sri Lanka. Topographically, it is dominated by the Indian Plate and defined largely by the Indian Ocean on the south, and the Himalayas, Karakoram, and Pamir mountains on the north. The Amu Darya, which rises north of the Hindu Kush, forms part of the north western border. On land (clockwise), South Asia is bounded by Western Asia, Central Asia, East Asia, and Southeast Asia. In 2010, South Asia had the world's largest populations of Hindus, Muslims, Sikhs, Jains and Zoroastrians. South Asia alone accounts for 98. 47% of Hindus, 90. 5% of Sikhs, and 31% of Muslims worldwide, as well as 35 million Christians and 25 million Buddhists. Countries in South Asia - Bangladesh, Bhutan, India, Pakistan, Nepal, Sri Lanka, Afghanistan, Maldives.

512 Live Notices for South Asia non renewable energy tenders

Showing 1 to 20

Supply of CHARCOAL COCONUT SHELL (Call with Sample)
country Sri Lanka
posting date01 Apr 2025
deadline24 Apr 2025
Supply And Delivery Of Non-Coking Coal-1500 Mt.
country Nepal
posting date31 Mar 2025
deadline30 Apr 2025
Provision of Operation Support Service for Coal Feeding System
country Sri Lanka
posting date27 Mar 2025
deadline23 Apr 2025
Provision of Coal Yard Management Support Service
country Sri Lanka
posting date27 Mar 2025
deadline23 Apr 2025
Supply of Spare Parts for Coal Unloading Belt Conveyors of Lakvijaya Power Plant
country Sri Lanka
posting date27 Mar 2025
deadline07 May 2025
Carrying Of Bitumen By Motor Trucks Or Any Other Means, In/C. Loading Unloading At Both Ends And Stacking Properly At Site As Per Direction Of The Engineer Form Meghna Petroleum Ltd.'S Depot, At Potenga, Chottogram To Nilphamari Road Divis.
country Bangladesh
posting date27 Mar 2025
deadline10 Apr 2025
Ancillary Electrical Works Including Installation Of Sub-Meter On The Floors Allocated For The Construction Project Of Rooppur Nuclear Power Plant In National Museum Of Science And Technology (Nmst) In Sher-E-Bangla Nagar, Dhaka.
country Bangladesh
posting date26 Mar 2025
deadline09 Apr 2025
Procurement Of Lot-1: Anti-Scalant For Reverse Osmosis (Ro) System; Lot-2: Security Filter (Membrane Type) For Reverse Osmosis (Ro) System; Lot-3: Corrosion Inhibitor For Circulating Cooling Water Pond (Cwp) & Lot-4: Hydrazine Hydrate (N2H4.2H2O) For Barapukuria 275Mw (3Rd Unit) Coal Fired Thermal Power Plant, Bpdb, Dinajpur Bangladesh 27.11.0000.304.25.437.25
country Bangladesh
posting date25 Mar 2025
deadline08 May 2025
Supply of Medicine and Medical / Surgical equipments : Xylene substitute : non –toxic\nsubstitutes of alcoholic degree and\nXylol (mixture of alcohol and linear\nhydrocarbons)\nPacking : 2500ml etc .
country Sri Lanka
posting date21 Mar 2025
deadline28 Apr 2025
Supply of CHARCOAL COCONUT SHELL (Call with Sample)
country Sri Lanka
posting date20 Mar 2025
deadline24 Apr 2025
Supply Of Goods For Coal Yard Management System, Reclaiming Belt, Steel Fabrication Plants, Moisture Lab And Others
country Bangladesh
posting date18 Mar 2025
deadline09 Apr 2025
Supply of 2,800,000 BBLS ±5% of Murban Crude Oil
country Sri Lanka
posting date15 Mar 2025
deadline08 Apr 2025
Procurement Of Liveries For Security Personnel Of Barapukuria Coal Fired Thermal Power Station.
country Bangladesh
posting date13 Mar 2025
deadline08 Apr 2025
Supply, Fitting, Fixing, Installation And Commissioning Of Scientific/ Lab. Equipments For Petroleum And Mining Engineering Dept. Of Jashore University Of Science & Technology
country Bangladesh
posting date11 Mar 2025
deadline08 Apr 2025
500Kva, 750Volt, 3Phase Brushless Alternator Along With Fitted Flexible Coupling Suitable For Cummins Ktaa19G10 Engine O.
country India
posting date05 Apr 2025
deadline28 Apr 2025
Rectifier, Rot, F4,5 Having Part No A058X432 For Stamford Alternator
country India
posting date05 Apr 2025
deadline17 Apr 2025
Repairing, Servicing Of Diesel Engine Alternator Sets On Call Basis Maintenance In Various Te Bts Sites In Ba Sagar Under Bsnl Electrical Division Bhopal
country India
posting date05 Apr 2025
deadline16 Apr 2025
Work Of Repairing Of Damaged Conveyor Belt And Replacement Of Connected Parts And Replacement/Refitting Of Rollers/Roller Stands, Lifting And Releasing Of Conveyor Take Up Etc. At Coal Handling Plant Of Unit -1 To 7, Wtps & Gtps.
country India
posting date05 Apr 2025
deadline01 May 2025
Rubber Pad For 25 Kw Alternator For V [Rubber Pad For 25 Kw Alternator For V -Deep Groove Axle Pulley Size - 18X210X240 .
country India
posting date05 Apr 2025
deadline15 Apr 2025
Telecommunication Cable - Fully Filled Petroleum Jelly Orabsorbent Thixotropic Gel (V2) (Q2) Quantity: 3000
country India
posting date05 Apr 2025
deadline14 Apr 2025