1347 Live Notices for Building Construction bids and RFP from Spain
Showing 1 to 20
Bidding Announcement Of: Economic And Technical Division (National Police Corps). Object: The Exploitation Of The Cafeteria Service, Restaurant And Vending Machines In The Police Complex Of The International Cooperation Division, Located On Pius Xii 50, 280016 Avenue In Madrid. File: Z25Co003/060.
Expansion Of Second Level Of Government Of Navarra
Contracting Of The Renewal For The Year 2024 Of The Use Licenses, Including Its Maintenance And Updates, Of The Ibm Spss Statistical Program Of Government Of Navarra
Hiring Of The Expansion Of The Servant Infrastructure Of The Distributed Environment Of Government Of Navarra
Maintenance Of Radiotelephony Digital Trunking Terminals Of The Government Of Navarra During The Year 2024
Comprehensive Reform Of The Restoning Workshop In The Borreguile Machinery Building
Conservation And Maintenance Service Of Cjalfp Sscc Headquarters
Supply And Assistance In The Installation Of Prefabricated Toilet And One Control Booths (Zayas Telesquí), At The Sierra Nevada Ski Resort.
Execution Of The New Offices (Phase I) Of Cetursa At The Montebajo Sports Club, Sierra Nevada (Monachil).
Common And Outdoor Areas Of The Cepta De Malaga Techpark Building Works
Supply Of Prefabricated Modules (Including Assembly And Disassembly) For The Health Devices Of The Romero And Virgin Plan. File 0000103/2025 (Cont 2025 0000171581)
Hiring Of The Works For The Conditioning Of The Antequera Cpa
217/Ise/2024/Ja - Work Demolition Gymnasium From Ceip San Isicio De Cazorla
Summer De Lacosamida (Doe), Daptomicin (Doe), Abacavir (Doe), Ambrisentan (Doe), Eribulin (Doe), Darunavir (Doe), Pomalidomida (Doe) Y Dexmedomidine (Doe)
Equipment Supply For The Oion Health Center
Waterproofing Building E4 Of The Vitoria-Gasteiz Campus Of Euskadi Technology Park.
Public Services
Ribera Forest Recovery Project And Elimination Of The Invasive Species Around Donax In The Mula River From The Rodeos Reservoir To The Confluence With The Segura River, Within The Framework Of The Recovery, Transformation And Resilience (Prtr) Plan.
Execution Of The Second Phase Of Sustainable Rehabilitation Of The Atauri Station For Its Adaptation As A Center For The Interpretation Of Natural Asphalts Of Alava Mountain Within The Frame Of Recovery, Transformation And Resilience - Funded By The European Union - Nextnerationu.
Use Of Municipal Mountains