208 Live Notices for Renewable Energy bids and RFP from Spain
Showing 1 to 20
Announcement By The Department Of Industry And Energy Of The Government Subdelegation In Valladolid, By Which The Request For Recognition, Specifically, Of Public Utility Of The "Las Campaneras" Photovoltaic Solar Installation, With An Installed Capacity Of 50.1 Mw And A Peak Capacity Of 56.01 Mw And Its Evacuation Infrastructure, In The Municipalities Of Bocigas And Olmedo, In The Province Of Valladolid, Is Submitted To Public Information.
Conservation And Maintenance Service For Heating, Air Conditioning, Photovoltaic Installations, Domestic Hot Water, Gas And Geothermal Energy In The Municipal Buildings Of The Basauri City Council
Tender For Photovoltaic Installation In The Brigade Pavilion
Responsible For The Contract For The Supply Of Photovoltaic Generation Systems And Led Lighting In Ies Dependent On The Department Of Education, Science And Fp
Mixed Contract For The Design And Supply Of 3 Ceramic Sculptures Using Renewable Energy For Installation In And Outside The Ceramic Island Centre, Financed By Next Generation-Eu Funds Through The Prtr (C14.L1.S2). Action 8-Axis 2.
P2024-41 Contract For The Construction Of A 6-Point Electric Vehicle Charging Facility At The University Hospital Of Navarra, In Pamplona / Iruña (Navarra) Through A Simplified Procedure And Financed With Funds From The European Union-Nextgenera
Installation Of Photovoltaic Panels At The Petritegi Wwtp Within The Framework Of The Recovery, Transformation And Resilience Plan – Financed By The European Union – Next Generation Eu
Contracting For The Supply, Installation, Processing And Commissioning Of Photovoltaic Solar Panels In The Majori Sports Centre, Within The Framework Of The Recovery, Transformation And Resilience Plan – Financed By The European Union – Nextgeneration Eu
Supply And Installation Of Photovoltaic Panels For Individual Self-Consumption With Compensation Of Surpluses In Central Services Of Lanbide-Basque Employment Service
The Installation Of Two Electric Vehicle Charging Points In Each Of The Affected Municipalities (Brihuega, Cifuentes And Molina)
Photovoltaic Installation At Asolaze Campsite
Execution Of Works To Install Aerothermal Energy, Photovoltaics, Green Roofs And Water Recycling, To Improve The Energy Efficiency Of The Ceip El Zargal Public Building In The Municipality Of Cenes De La Vega (Granada) Within The “Recovery, Transformation And Resilience Plan Financed By The European Union Next Generation Eu.”
Works Contract For The Execution Of The Photovoltaic Installation Of The Salt Deposit.
Drafting Of The Project, Management And Execution Of The Works For The Rehabilitation Of The Roof Of The Second Floor Of The Lehendakaritza Building And The Supply, Assembly, Start-Up, Optimisation And Maintenance Of A Photovoltaic Installation Of At Least 70 Kw Peak, On The Roof Of The Building.
The Subject Of This Contract Is The “Supply, Assembly And Commissioning Of A Steam Boiler At The Form Treatment Plant In Vallès Occidental”, Within The Framework Of Component 12 (Spain Industrial Policy 2030) And Investment C12.I3. Plan De Apoyo A La Implemenación De La Normativa De Residuos Y Al Fomento De La Economia Circular) Co-Financed Within The “Plan De Recuperación, Transformation And Resilience – Finançado Por Fundos Next Generation Eu”. The Supply Must Be Carried Out At The Can Barba Composting And Biomethanization Plant, Located At Camí De Can Coniller, Nº 22, 08227 Terrassa. The Object Of The Contract Includes The Supply, Assembly And Commissioning Of A Dual Steam Boiler, Biogas And Diesel, For The Production Of Steam, Which Will Be Located Within The Anaerobic Digestion Plant For Organic Waste From Municipal Selective Collection, As Well As The Dismantling And Management Of The Waste Generated From The Currently Installed Boiler.
Execution Of The Works Of The Photovoltaic Installation Planned In The Salt Deposit
Upps- Work Of Installation Of Solar Energy Self-Consumption Plants Photovo
Drafting Of The Project, Management And Execution Of The Works For The Rehabilitation Of The Roof Of The Second Floor Of The Lehendakaritza Building And The Supply, Assembly, Start-Up, Optimisation And Maintenance Of A Photovoltaic Installation Of At Least 70 Kw Peak, On The Roof Of The Building.
Supply And Installation Of A Photovoltaic Solar System For The Uarkape Fronton In Arrasate
Announcement By The General Subdirectorate Of Electric Energy, Publicizing The Resolution By Which The Company Solar Eaas, S.L. Is Disqualified From Carrying Out Marketing Activities, Its Clients Are Transferred To A Reference Marketer And The Conditions Of Supply To Said Clients Are Determined.