18 Live Notices for Sub-Saharan Africa Coal Tenders
Showing 1 to 18
The Removal, Collection, And Disposal Of Coal, Ash, And Fabric Filter Bags From Research Testing And Development (Rt&D) To The Licensed Landfill Site For The Period Of Five (5) Years On An ‘As And When’ Required Basis.
Consolidation Of All Rcb Coal Stockpiles To A Bop Conveyor Solution For Transnet Soc (Reg. N0 1990/000900/30) Operating As Transnet Port Terminals Richards Bay (Hereinafter Referred To As “Tpt Rcb”)
Consolidation Of All Rcb Coal Stockpiles To A Bop Conveyor Solution For Transnet Soc (Reg. N0 1990/000900/30) Operating As Transnet Port Terminals Richards Bay (Hereinafter Referred To As “Tpt Rcb”)
The Removal, Collection, And Disposal Of Coal, Ash, And Fabric Filter Bags From Research Testing And Development (Rt&D) To The Licensed Landfill Site For The Period Of Five (5) Years On An ‘As And When’ Required Basis.
The Removal, Collection, And Disposal Of Coal, Ash, And Fabric Filter Bags From Research Testing And Development (Rt&D) To The Licensed Landfill Site For The Period Of Five (5) Years On An ‘As And When’ Required Basis.
For The Appointment Of Service Provider For Conducting Occupational Hygiene Surveys At Transnet Engineering (Te) Businesses At The Koedoespoort Plant, Coal North And Northeast Corridors Over A Period Of Two (2)-Years
Providers for the Transportation of Steam Coal to Van Eck Power Station for a period of Three (3) Years
Conveyor Splicing For Ash, Coal, And Dust Plant For A Period Of Five Years As And When Required At Lethabo Power Station Over A Period Of Five (5) Years.
Transpotation Of Coal And Rubbles
Regret Letter - Provision Of Sample Analysis (Coal, Ash, Metals, Oil Filtrates And Asbestos Analysis) Using The Qemscan Or Tescan For The Period Of Two Years On As And When Required Basis At Eskom Research, Testing And Development In Rosherville.
Regret Letter - Provision Of Sample Analysis (Coal, Ash, Metals, Oil Filtrates And Asbestos Analysis) Using The Qemscan Or Tescan For The Period Of Two Years On As And When Required Basis At Eskom Research, Testing And Development In Rosherville.
The Provision Of Cleaning Services For The Ash And Coal Plant At Medupi And Kusile Power Station For Eskom Rotek Industries, For A Period Of 48 Months On An As And When Required Basis
Notification Of Extension Of The Bid Validity Date For The Appointment Of A Panel Of Service Providers For Legal Transactional Advisors For African Exploration Mining And Finance Corporation (Soc) Ltd (“Aemfc”) For A Period Of Three (3) Years.
The Provision Of Cleaning Services For The Ash And Coal Plant At Medupi And Kusile Power Station For Eskom Rotek Industries, For A Period Of 48 Months On An As And When Required Basis
Regret Letter And Award Letter For Performance And Testing Service (Pf Sampling, Pa & Sah Air Heater Leakage Test, Esp Efficiency Test, Coal & Ash Sampling) For A Three (3) Year’S Period At Lethabo Power Station.
Regret Letter And Award Letter For Performance And Testing Service (Pf Sampling, Pa & Sah Air Heater Leakage Test, Esp Efficiency Test, Coal & Ash Sampling) For A Three (3) Year’S Period At Lethabo Power Station.
Different Germiston
The Provision Of Cleaning Services For The Ash And Coal Plant At Medupi And Kusile Power Station For Eskom Rotek Industries, For A Period Of 48 Months On An As And When Required Basis