36 Live Notices for Tunnels bids and RFP from Switzerland
Showing 1 to 20
Mp-120043 ; Mp-160082 N02 Secondo Tubo San Gottardo (2Tg) – Complete System Gotthard Road Tunnel (Gtg), Lot 8301 - Supply And Installation Of Escape Route Sliding Doors
Apbb Pu Pedestrian Underpass Bh Bern 2.0
Apbb Pu Pedestrian Underpass Bh Bern 2.0
Apbb Pu Pedestrian Underpass Bh Bern 2.0
General Planner - Phases From Construction Project To Commissioning (Sia Sub-Phases 32-53), Zimmerberg Base Tunnel 2 (Zbt2)
Pv / Bl For The 2Nd Repair Of The Seelisberg Tunnel (Part I); Phases Mp Up To And Including Implementation (Incl. Bl) For The Energy Supply And Lighting As Well As Phase Mk For The Remaining Bsa Systems And Construction Measures.
New Underpass - Düdingen Station
General Contractor – Project Phases From The Structure Until Commissioning (Partial Phases 32-53 Of The Sia), Zimmerberg Base Tunnel 2 (Tbz 2)
General Planner - Phases From Construction Project To Commissioning (Sia Sub-Phases 32-53), Zimmerberg Base Tunnel 2 (Zbt2)
Apr / Dlt For The 2Nd Renovation Of The Seelisberg Tunnel (Part I); Mp Phases Including Implementation (Including Dlt) For Energy Distribution And Lighting As Well As The Mk Phase For The Remaining Bsa Installations And Structural Measures.
Replacement Of The Safety Device In The Schweizerhalle Tunnel And Installation Of The Same Device In The New Additional Safety Galleries Of The Tunnel.
Mp-190096, N02 Hagnau-Augst Maintenance Project, Replacement Of The Safety Equipment In The Tunnel And Implementation Of The Safety Equipment For The Additional, New Escape Routes In The Schweizerhalle Tunnel.
Pv / Bl For The 2Nd Repair Of The Seelisberg Tunnel (Part I); Phases Mp Up To And Including Implementation (Incl. Bl) For The Energy Supply And Lighting As Well As Phase Mk For The Remaining Bsa Systems And Construction Measures.
Mp-190096, N02 Hagnau-Augst Maintenance Project, Replacement Of The Safety Equipment In The Tunnel And Implementation Of The Safety Equipment For The Additional, New Escape Routes In The Schweizerhalle Tunnel.
Mp-190096, N02/12 Maintenance Project Hagnau – Augst Renewal Of Bsa, Jet Fans Tunnel Schweizerhalle
Mp-190096, N02/12 Maintenance Project Hagnau – Augst Renewal Of Bsa, Jet Fans Tunnel Schweizerhalle
Mp-190096, N02/12 Maintenance Project On The Hagnau – Augst Section, Replacement Of Ees (Jet Fans In The Schweizerhalle Tunnel)
Apr / Dlt For The 2Nd Repair Of The Seelisberg Tunnel (Part I); Mp Phases With Implementation Included (Including Dlt) For Energy Distribution And Lighting As Well As The Mk Phase For The Rest Of The Bsa Installations And Structural Measures.
Pv / Bl For The 2Nd Repair Of The Seelisberg Tunnel (Part I); Phases Mp Up To And Including Implementation (Incl. Bl) For The Energy Supply And Lighting As Well As Phase Mk For The Remaining Bsa Systems And Construction Measures.
220Kv Line Airolo-Mettlen, Cabling In The Gotthard Tunnel, Hv Cable