Most trusted source for Tendering Opportunities and Business Intelligence since 2002
Country - Brazil
Summary - Installation Of Special Gas Lines Branching Services In Nitrogen And Oxygen Gas Lines To Be Performed In Accordance With Abnt-Nr/Astm-Aisi Installation Technical Standards, With Coverage Of Technical Hours, Travel Expenses, Food And Other Costs Necessary For Carrying Out The Previous Technical Inspection And Services At The Cubatão Unit. For The Execution Of The O2 Line Branch Installation Services, The Following Materials Must Be Considered: 02 Meters Of 316L ¼¨ Rigid Seamless Stainless Steel Pipe, ¼¨ Rail Clamp, ¼¨ Double Washer Union, 01 Regulator Post From 0 To 16 Bar, Stainless Steel Plate Fixing Support; And For Branching Of The N2 Line, 10 Meters Of ¼" Copper Pipe, 01 Regulator Post From 0 To 16 Bar, Stainless Steel Plate Fixing Support Must Be Considered. The Services Of Assembly Of Pipeline And Installation Of Fine Adjustment Post Regulator Valves, Leak Test, Technical Inspection Of Components And Delivery Of Art And Report Must Be Performed. The Contracted Company Shall Be Responsible For Supplying And Installing, By Means Of Specialized Labor, All Material Necessary For The Above-Mentioned Installation; Two-Year Warranty. Preparation Of Proposal, The Company May Make A Technical Visit To The Facilities Of The Cubatão Laboratory Division To Obtain The Technical Information Necessary For The Execution Of The Services,
Deadline - Feb 10, 2025
GT reference number - 102474233
Product classification - Construction structures and materials; auxiliary products to construction (except electric apparatus)
Address - Brazil
Contact details - 565656565
Tender notice no. - 76454545
GT Ref Id - 102474233
Document Type - Tender Notices
Description - notice_title: Installation Of Special Gas Lines Branching Services In Nitrogen And Oxygen Gas Lines To Be Performed In Accordance With Abnt-Nr/Astm-Aisi Installation Technical Standards, With Coverage Of Technical Hours, Travel Expenses, Food And Oth er Costs Necessary For Carrying Out The Previous Technical Inspection And Services At The Cubatão Unit. For The Execution Of The O2 Line Branch Installation Services, The Following Materials Must Be Considered: 02 Meters Of 316L ¼¨ Rigid Seamless Stainless Steel Pipe, ¼¨ Rail Clamp, ¼¨ Double Washer Union, 01 Regulator Post From 0 To 16 Bar, Stainless Steel Plate Fixing Support; And For Branching Of The N2 Line, 10 Meters Of ¼" Copper Pip
Gt Ref Id - 102474233
Deadline - Feb 10, 2025
Similar Tenders :
Why Us
3,00,000 +
Users
190 +
Countries Covered
5,00,000 +
Agencies Tracked
50,000 +
Notices Daily
90 Million +
Database