Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

It Consists Of The Execution Of The Project Project Called "Access To A New Level Passage On The R-3 Line". - This Constructive Project Is The Definition In Detail Of The Construction Works Of The Connecting Roads Of The New Level Passage With The Road Network Of The Village But Not The Crossing Of The Road, Since It Is Expected That The Drafting Of The Project Of This Second Work Is Carried Out By The Adif. -The Project Consists Of A New Road That Comes From The Extension Of The Tona Path Of The Polygon L'Avellanet, Which Runs Attached To The West Side Of The Railway Strip. After Heading South About 125 Meters Separates From The Grounds Of The Railway Infrastructure With A Curve To The Right, And Then With A Second Turn To The Left Is Perpendicular To The Road In Order To Of Crossing Through The New Level Passage. Once The Train Line Has Been Crossed, Continue With A Straight Line Alignment In The East Direction Until You Reach The Camí Ral. The Rest Of The Route Follows The South-North Direction Of The Camí Ral. In This Last Section We Seek To Widen The Existing Road In Order To Allow For An Adequate Circulation Of The Trucks And To Arrange The Corner With The Road Of Serra D'Ase. The Total Length Of This New Itinerary Is 390 Meters, And Occupies An Area, Including Overlapping Due To The Slopes Of The Dismantles And Embankments Of The Esplanade, Of 4,100 Square Meters.

Entitat Municipal Descentralitzada de Sant Miquel deBalenya Spain has Released a tender for It Consists Of The Execution Of The Project Project Called "Access To A New Level Passage On The R-3 Line". - This Constructive Project Is The Definition In Detail Of The Construction Works Of The Connecting Roads Of The New Level Passage With The Road Network Of The Village But Not The Crossing Of The Road, Since It Is Expected That The Drafting Of The Project Of This Second Work Is Carried Out By The Adif. -The Project Consists Of A New Road That Comes From The Extension Of The Tona Path Of The Polygon L'Avellanet, Which Runs Attached To The West Side Of The Railway Strip. After Heading South About 125 Meters Separates From The Grounds Of The Railway Infrastructure With A Curve To The Right, And Then With A Second Turn To The Left Is Perpendicular To The Road In Order To Of Crossing Through The New Level Passage. Once The Train Line Has Been Crossed, Continue With A Straight Line Alignment In The East Direction Until You Reach The Camí Ral. The Rest Of The Route Follows The South-North Direction Of The Camí Ral. In This Last Section We Seek To Widen The Existing Road In Order To Allow For An Adequate Circulation Of The Trucks And To Arrange The Corner With The Road Of Serra D'Ase. The Total Length Of This New Itinerary Is 390 Meters, And Occupies An Area, Including Overlapping Due To The Slopes Of The Dismantles And Embankments Of The Esplanade, Of 4,100 Square Meters. in Infrastructure and construction. The tender was released on Feb 08, 2025.

Country - Spain

Summary - It Consists Of The Execution Of The Project Project Called "Access To A New Level Passage On The R-3 Line". - This Constructive Project Is The Definition In Detail Of The Construction Works Of The Connecting Roads Of The New Level Passage With The Road Network Of The Village But Not The Crossing Of The Road, Since It Is Expected That The Drafting Of The Project Of This Second Work Is Carried Out By The Adif. -The Project Consists Of A New Road That Comes From The Extension Of The Tona Path Of The Polygon L'Avellanet, Which Runs Attached To The West Side Of The Railway Strip. After Heading South About 125 Meters Separates From The Grounds Of The Railway Infrastructure With A Curve To The Right, And Then With A Second Turn To The Left Is Perpendicular To The Road In Order To Of Crossing Through The New Level Passage. Once The Train Line Has Been Crossed, Continue With A Straight Line Alignment In The East Direction Until You Reach The Camí Ral. The Rest Of The Route Follows The South-North Direction Of The Camí Ral. In This Last Section We Seek To Widen The Existing Road In Order To Allow For An Adequate Circulation Of The Trucks And To Arrange The Corner With The Road Of Serra D'Ase. The Total Length Of This New Itinerary Is 390 Meters, And Occupies An Area, Including Overlapping Due To The Slopes Of The Dismantles And Embankments Of The Esplanade, Of 4,100 Square Meters.

Deadline - Mar 03, 2025

GT reference number - 102942870

Product classification - Urban development construction work

Organization Details:

  Address - Spain

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 102942870

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: It consists of the execution of the project project called "Access to a new level passage on the R-3 line". - This constructive project is the definition in detail of the construction works of the connecting roads of the new level passag e with the road network of the village but not the crossing of the road, since it is expected that the drafting of the project of this second Work is carried out by the Adif. -The project consists of a new road that comes from the extension of the Tona path of the Polygon l'Avellanet, which runs attached to the west side of the railway strip. After heading south about 125 meters separates from the grounds of the railway infrastructure with a curv

Gt Ref Id - 102942870

Deadline - Mar 03, 2025

Share share

Similar Tenders :

Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database