Description |
Description: Water Supply: To study, analyse, design and prepare detailed project report (DPR) for providing a Water Supply System in the leftout / Newly formed streets in added areas of CMWSSB by undertaking a technical, financial, economic, environmental, social, gender study with climate resilient aspects with prioritized capital investment plan, conducting field surveys & investigations, detailed designs, drawings, cost estimates, tenderable bidding documents for planning and implementation. Under Ground Sewerage System (UGSS): To study, analyse, design and prepare DPR for providing a UGSS in the left out / Newly formed streets in the added areas of CMWSSB by undertaking a technical, financial, economic, environmental, social, gender study with climate resilient aspects with prioritized capital investment plan, conducting field surveys & investigations, detailed designs, drawings, cost estimates, tenderable bidding documents for planning and implementation. To prepare tenderable bid documents in adequate packages on as required basis. local title:: LOAN-4253 IND: Tamil Nadu Urban Flagship Investment Program Tranche 3 - XIII “Preparation of DPR for providing Water Supply System and Underground Sewerage System to the Left out Streets / Areas and Newly formed (49107-010) grossbudgetlc: 1.0
|