Narva 100Mw Hydrogen-Powered Thermal Power Plant Keys-Hand Design, Source And Construction

Enefit Industry AS Estonia has Released a tender for Narva 100Mw Hydrogen-Powered Thermal Power Plant Keys-Hand Design, Source And Construction in Building. The tender was released on Apr 28, 2025.

Country - Estonia

Summary - Narva 100Mw Hydrogen-Powered Thermal Power Plant Keys-Hand Design, Source And Construction

Deadline - May 13, 2025

GT reference number - 107774923

Product classification - Construction works for power plants and heating plants

Organization Details:

  Address - Estonia

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 107774923

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: The procured station is designed for cogeneration of electricity and heat and for the provision of frequency reserves. The total capacity of the planned power plant is approximately 100 MW and will be located at the Baltic power plant. I t is based on gas column technology, with each engine's power between 4 and 13 MW. The plant will operate mainly on natural gas or biomethane and can use up to 25%of the hydrogen as fuel.local title:: Narva 100MW vesinikuvõimekusega soojuselektrijaama võtmed-kätte projekteerimine, hankimine ja ehitamineContract Duration: : 36 MONTHContract Type: : Workslocal description: : Hangitav jaam on mõeldud elektri ja soojuse koostootmiseks ning sagedu

Gt Ref Id - 107774923

Deadline - May 13, 2025

Share share

Similar Tenders :

Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database