Description |
Description: SUPPLY OF MATERIALS FOR CONSTRUCTION OF Godown IN HOUSANUR VILLAGE TP Guledagudda local title:: SUPPLY OF MATERIALS FOR CONSTRUCTION OF Godown IN HOUSANUR VILLAGE TP Guledagudda earnest_money_deposit: 20000 Contract Type: : Supply local description: : SUPPLY OF MATERIALS FOR CONSTRUCTION OF Godown IN HOUSANUR VILLAGE TP Guledagudda Gross Budget LC: : 957003.71 Document Fee: : 500 est_amount: 957003.71 lot_details: 1: Add Brush, putty, glue at 5 Percentage on cost of paint (Hos1), 2: Whitening (Hos1), 3: Dry distemper (Hos1), 4: Mason Class I (with tools) (Hos1), 5: Add Brush at 1Percentage on cost of paint (Hos1), 6: Enamel metal paint (Hos1), 7: Add providing and removing scaffolding at 3 Percentage on Labour (Hos1), 8: Painter Class I (Hos1), 9: Add Wire brush, fine steel wool, putty, sand paper, at 3 Percentage on cost of paint(Hos1), 10: Ready mix primer paint (Ready mix red lead paint)(Hos1), 11: Add HOM of welding and grinding machine at 4 Percentage on Material (Hos1), 12: Fitter Class I (Hos1), 13: M.S Rods (Hos1), 14: Unit Cost as per the Specification (Hos1), 15: Tools and Plants at 2 Percentage on material (Hos1), 16: HOM of cutting and grinding machine (Hos1), 17: Mechanic Class II/Mechanic HmP Grade I/EME Grade (Hos1), 18: Add (Hos1), 19: HOM of welding and grinding machine (Hos1), 20: Welder Grade I (Hos1), 21: Corbon electrodes (Hos1), 22: RMS Gusset plate (Hos1), 23: MS pipes of 80 mm to 100 mm dia (Hos1), 24: Add Handling , loading and unloading at 1Percentage on Material (Hos1), 25: Burnt bricks class 35 (non modular)(Hos1), 26: Casurina Poles 75 - 100 mm dia (Hos1), 27: Add sundries charges at 2 Percentage on Material (Hos1), 28: Add Handling , loading and unloading at 2Percentage on Material (Hos1), 29: Bolts and nuts (Hos1), 30: MS flat (Hos1), 31: Casurina poles 100 - 150 mm (Hos1), 32: Silver oak or equivalent planks 38 mm thick (Hos1), 33: Jungle wood runners and planks (Hos1), 34: Binding wire (Hos1), 35: TMT bars |