Toggle Offcanvas
...
Global Government Tenders

Most trusted source for Tendering Opportunities and Business Intelligence since 2002

The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head

Ajuntament de Sant Pere de Torello Spain has Released a tender for The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head in Infrastructure and construction. The tender was released on Apr 16, 2025.

Country - Spain

Summary - The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head

Deadline - May 11, 2025

GT reference number - 107062615

Product classification - Thermal insulation work

Organization Details:

  Address - Spain

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 107062615

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: The existing building does not have continuous thermal insulation throughout its envelope and has a large number of thermal bridges that cause energy losses. For this reason, measures of roof isolation and facades are proposed and the re placement of exterior carpentry to ensure that it complies with the parameters described in the CTE according to the climate zone in which the equipment is located (zone D1). It is proposed to carry out the installation of cooling and ventilation of the pavilion through a roof-top type system, it is a compact unit that performs the dual function. It is connected to a properly isolated network of behaviors to distribute the air inside. It is a ver

Gt Ref Id - 107062615

Deadline - May 11, 2025

Share share

Similar Tenders :

Create Account

Why Us

3,00,000 +

Users

190 +

Countries Covered

5,00,000 +

Agencies Tracked

50,000 +

Notices Daily

90 Million +

Database