Description |
SINGLE STAGE REQUEST FOR PROPOSAL DOCUMENT FOR SELECTION OF BIDDER AS TRANSMISSION SERVICE PROVIDER THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS TO ESTABLISH INTER-STATE TRANSMISSION SYSTEM FOR Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 and 4 (2x1000 MW) ISSUED BY Registered Office: 1st Floor, “Urjanidhi”, 1, Barakhamba Lane, Connaught Place, New Delhi-110001 REQUEST FOR PROPOSAL NOTIFICATION PFC Consulting Limited (A wholly owned subsidiary of Power Finance Corporation Limited) Corporate Office: 9 th Floor, A-Wing, Statesman House Connaught Place, New Delhi-110001 1. The Government of India, Ministry of Power, vide its notification No. CG-DL-E-15032024- 253080 dated March 15, 2024 has notified PFC Consulting Limited (PFCCL) to be the Bid Process Coordinator (BPC) for the purpose of selection of Bidder as Transmission Service Provider (TSP) to establish Inter-State transmission system for “Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 and 4 (2x1000 MW)” through tariff based competitive bidding process. 2. PFC Consulting Limited (PFCCL) (hereinafter referred to as BPC) hereby invites all prospective Bidders for issue of Request for Proposal (RFP) for selection of Bidder as Transmission Service Provider (TSP) on the basis of international competitive bidding in accordance with the “Tariff Based Competitive Bidding Guidelines for Transmission Service” and “Guidelines for Encouraging Competition in Development of Transmission Projects” issued by Government of India, Ministry of Power under section – 63 of The Electricity Act, 2003 and as amended from time to time. The responsibility of the TSP would be to establish the following Inter-State Transmission System – “Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 and 4 (2x1000 MW)” (hereinafter referred to as 'Project’) on build, own, operate and transfer basis and to provide transmission service: S. No Transmission System under ISTS for evacuation of power from Kudankulam Unit - 3 and 4 (2x1000 MW) Name of Transmission Element Scheduled COD in months from Effective Date 1. KNPP 3and4 – Tuticorin-II GIS PS 400 kV (quad) D/C line 400 kV GIS line terminal equipment at Tuticorin-II GIS – 2 nos. 30 months (Dec 2026) Note: Line and GIS terminal equipment at Tuticorin-II GIS under ISTS scope and bays at KNPP under NPCIL scope 3. The TSP shall ensure that design, construction and testing of all equipment, facilities, components and systems of the Project shall be in accordance with the provisions of the Transmission Service Agreement and applicable Rules/ Regulations, Orders and Guidelines issued by the Central Government. 4. Transmission License: The TSP shall obtain the Transmission License from the Commission. 5. Bidding Process: The Transmission Service Provider shall be selected through tariff based competitive bidding process for the Project based on meeting stipulated Qualification RFP for Selection of Bidder as Transmission Service Provider PFC Consulting Limited 4 Requirements prescribed in Clause 2.1 of Section 2 of RFP and the lowest Quoted Transmission Charges discovered from Final Offers quoted during the e-reverse bidding. The selection of the TSP shall be subject to it obtaining Transmission License from the Commission, which, after expiry, may be further extended by such period as deemed appropriate by the Commission under powers vested with it to amend the conditions of the Transmission License. The entire bidding process shall be conducted on electronic platform created by MSTC Limited. The Bid shall be a single stage two envelope bid comprising the Technical Bid and the Financial Bid. The Bidders shall submit the Bid online through the electronic bidding platform. In addition to the online submission, the Bidder with lowest Final Offer will be required to submit original hard copies of Annexure 3, Annexure 4 (if applicable), Annexure 6 (if applicable) and Annexure 14 before issuance of LoI. There shall be no physical submission of the Financial Bid. The Technical Bid shall be opened first and the Financial Bid of only the bidder who have qualified in the Technical Bid shall be opened. The Financial Bid will comprise of two rounds. In the first round the Initial Offer of the responsive bids would be opened and Quoted Transmission Charges of Initial Offer shall be ranked on the basis of ascending order. The Bidders, in the first fifty per cent of the ranking (with any fraction rounded off to higher integer) or four Bidders, whichever is higher, shall qualify for participating in the electronic reverse auction stage and submit their Final Offer. 6. The objective of the bidding process is to select a Successful Bidder pursuant to this RFP, who shall acquire one hundred percent (100%) of the equity shares of SPV [which is under incorporation] along with all its related assets and liabilities as per the provisions of the Share Purchase Agreement, at the Acquisition Price to be intimated by the BPC, twenty (20) days prior to the Bid Deadline. The SPV [which is under incorporation], of which one hundred percent (100%) equity shares will be acquired by the Selected Bidder, shall be responsible as the TSP, for ensuring that it undertakes ownership, financing, development, design, engineering, procurement, construction, commissioning, operation and maintenance of the Project, and to provide Transmission Service as per the terms of the RFP Project Documents. The TSP shall ensure transfer of all project assets along with substation land, right of way and clearances to CTU or its |