Estimate No. Justification Name Qty. Units Of Meas. Lot Supplied By: 6. Rainwater Treatment Facilities (1 Start-Up Complex) 1 B-4 Estimate: 6.602. Technological Equipment. Rainwater Treatment Facility 1 B-4 6.602.6. Co "Bos Dozhd 45" Cost Of The Rainwater Treatment Facility "Bos Dozhd 45", Capacity 45 L/Sec (18.3 T) 1.00 Set 1 B-4 Facility: 9. Sewage Pumping Station (1 Start-Up Complex) 1 B-4 Estimate: 9.601. Earthworks During The Construction Of Sewage Pumping Station 1 B-4 9.602.2. So Kns2 Sewage Pumping Station N2 1.00 Set 1 B-4 Facility: 10. Pumping Station For Pumping Rainwater With A Receiving Tank (2 Start-Up Complex) 1 B-4 Estimate: 10.602. Technological Equipment 1 B-4 10.60.2.7. So Boss 640 Tank "Bos Volume" 640 M3 In A Set (Prefabricated Blocks - 72 Pcs. + End Caps - 12 Pcs.) 1.00 Set 1 B-4 10.602.9. So Pump 220 Pump With Automatic Pipe Coupling Capacity Q=220.00 M3/Hour 4.00 Pcs 1 B-4 10.602.24. So Boss 420 Tank "Bos Volume" 420 M3 In A Set (Prefabricated Blocks - 45 Pcs. + End Caps - 8 Pcs.) 1.00 Set 1 B-4 10.602.26. So Pump 220 Pump With Automatic Pipe Coupling Capacity Q=220.00 M3/Hour 3.00 Pcs 1 B-4 10.602.41. So Boss 865 Tank "Bos Volume" 865 M3 In A Set (Prefabricated Blocks - 96 Pcs. + End Plugs - 12 Pcs.) 1.00 Set 1 B-4 10.602.43. So Pump 290 Pump With Automatic Pipe Coupling Capacity Q=290.00 M3/Hour 4.00 Pcs 1 B-4 Facility: 11. Rainwater Sewerage Treatment Facilities (2Nd Start-Up Complex) 1 B-4 Estimate: 11.602. Technological Equipment K2. Rainwater Runoff Treatment Facility N1 (105 L/S) 1 B-4 11.602.7. So Os1 (105 L/S)/Sp1656 Cost Of Rainwater Treatment Facility N1 "Bos Dozhd 105", Capacity 105 L/Sec (43 T) 1.00 Set 1 B-4 Estimate: 11.604. Technological Equipment K2. Rainwater Treatment Facility N2 (55 L/S) 1 B-4 11.604.7. So Os2 (55 L/S)/Sp1657 Cost Of Rainwater Treatment Facility N2 "Bos Dozhd 55", Capacity 55 L/Sec (25.8 T) 1.00 Set 1 B-4 Estimate: 11.606. Technological Equipment K2. Rainwater Treatment Plant N3 (140 L/S) 1 B-4 11.606.7. S