22 Live Notices for Brunei energy, power and electrical tenders
Showing 1 to 20
Provision of Pole Planting & Low Voltage Cable Installation for Brunei-Muara District for 3 Years
Provision of Pole Planting & Low Voltage Cable Installation for Brunei-Muara District for 3 Years
Provision of Grading and Protection Coordination Study for 11kv Network of Selected 66/11kv Zone Substations in Belait District
Supply and Installation of LED Screens and Equipment for Dewan Pahlawan, Berakas Garrison
Replacement of new doors and store frames at the Tutong Town Night Market and the Barik-Barik on Jalan Sungai Basong Tutong
Supply And Installation Of Decoartive Lightings’ At Jalan Enche Awang Pekan Tutong
Planting 28ft/35ft Poles & Installation of Low Voltage Cables for Brunei-Muara District for 3 Years
Protection Grading And Coordination Studies For 11kv Networks Of The Selective 66/11kv Zone Substation In Belait District
Repair and Repainting Works on the Exterior of the Twelve-Storey Telanai Tower Building, Simpang 179, Jalan Telanai, Brunei Darussalam
Mechanical And Electrical Term Maintenance For Bangunan-Bangunan Pusat Kegiatan Warga Emas Jabatan Pembangunan Masyarakat For A Period Of Twenty Four (24 ) Months
Domestic Waste Collection And Disposal For 24 Months At Pusat Bahagia Tutong, Jabatan Pembangunan Masyarakat
Replacement Of 15/20mva Power Transformer #1 At Mile 18
Purchase of 18 Months of Packaged Rations for RBAF Requirements
Supply And Install New Portable Outdoor Videowall Led Screen (Digital Electronic Score Board Panel) Complete With Control System (Software And Hardware) To Hassanal Bolkiah National Stadium
Service Level Maintenance Contract And Related Works (Package A) For His Majesty The Sultan’s Flight Hangar 1, Hangar 2 & Provision for Minor Works at Beribi Development Housing Insfrastructure
Supply and Delivery of Graphic Editing And Other Software Packages Licenses For Radio Television Brunei For A Period Of Two (2) Years Contract Term
Purchase of Equipment for the RBAF Special Forces Regiment Exercise Hall (Phase 3)
Laying MV Underground Cable for Mile 4, MIS Madewa & MIS Simpang Bengkurong.
Technical maintenance of Beribi substation GIS over a period of two years.
Replace Magnetic Contactor with Tripping and Damper Motor of AHU at SPARK Centre