39384 Live Notices for CIS infrastructure and construction tenders
Showing 1 to 20
Rammeaftale Vedrørende Vvs Og Ventilation
Etude D'Intermodalite Sur Le Pole D'Echange Multimodal De La Gare De Crecy-La-Chapelle
Construction Of Small Architectural Elements On A Playground In The Sucha Village, Plot No. 36/2 – Construction Of A Shelter
Reconstruction Of The 15 Kv Overhead Network, The 15/04 Kv "Gruczno 03 Skr" Station And The 0.4 Kv Overhead Network
Reconstruction Of The 15/04Kv "New Waterworks" Station
Reconstruction Of The 15 Kv Overhead Network, The 15/04Kv "Zamczyska" Station And The 0.4 Kv Overhead Network
Modernization Of The 0.4 Kv S-1698 Lv Overhead Line In Łupice, District No. 1
Reconstruction Of Lsn Piła Północ No. 34 To A 15Kv Mv Cable Line, 3X150 From Pole 85 To Pole 140
Execution Of Construction Works For The Investment Task Entitled: Sn-15 Kv Cable Connection Of The Sn-15 Kv Overhead Line On The Wyrzysk-Białośliwie And Wyrzysk-Kcynia Route Between The 15/0.4 Kv Transformer Station No. 03-1587 Krostkowo "B" And The 15/0.4 Kv Transformer Station No. 03-1654 Komorowo "A".
Construction And Demolition Of The Mv Power Grid In Krężoły, Sulechów Commune Wt 10/Ri/Rd4/2018
Construction And Demolition Of The Mv Power Grid In Kosobudz And Troszki, Łagów Commune Wt 02/Ri/Rd4/2018
Construction Of The Mv Power Grid In Zielona Góra, Krępa Street, Zawada Street, Krępowska Street, Brązowa Street Wt 02/Ri/Rd2/T/2019
Preparation Of The Retaining Wall Design And Construction Documentation, Including Obtaining A Building Permit
Construction Works In The Power Industry - 6 Tasks
Construction Of Cable Connections In The Leżajsk Re Area - 8 Parts.
Surveying Service For Staking Out And Post-Construction Inventory Of Mv Cable Line Routes Laid Using The Ploughing Method
Modernization Of The Facade Of The Accelerator Building No. 5 On The Premises Of Pge Energia Ciepła S.A. O. No. 1 In Krakow
Construction Of A Mv/Lv Power Grid In The Area Of Operation Of The Ełk Energy District Of Pge Dystrybucja S.A. Białystok Branch – 4 Parts
Construction Of Lv Connections In The Mielec Re Area – Task Packages For Connecting Recipients (Package 38)
Execution Of Design Work - 8 Tasks