Similar tenders from other countries.
Showing 1 to 20
Open Procedure Tender Pursuant To Art. 71 Of Legislative Decree 36/2023 For The Construction Of The Hydrogeological Accommodation Of The Pese Stream At The Bridge In Via Mondovì
Repair Of The Pinéa Bridge
New Bridge Replacement Building Zilling Bw 21 Public Tender
Deg 4-2025 Bridge-Replacement New Bridge Over The Wischlburger Lohe In The Area Of The Deg 4 Wischlburg Area
Deg 03-2025 Bridge And Ceiling Construction - Replacement New Building Of The Bridge Over The Mettenbach In Egg With Asphalt Ceiling Construction On The District Road Deg 3
Pi2045M Parris Island 3Rd Battalion Pond Causeway Repair
Fl Welaka Nfh Road Base Material For Hatcheryroads
Fort Drum Traffic Control Painting ? Cantonment Area
Village In The District And Village. Bridge-Rehabilitation Works (Location N2) In Levitana.
Realization Of A Detailed Partial Inspection Of The F.Mitterrand Bridge - Rocade De Bordeaux
Project Management For The Energy Renovation Of The Bridge Between The Tripod And The Pediatric Hospital
Public Tender Vob/A Demolition Of The Existing Structure And The Manufacture Of Replacement Construction Demolition Of The Existing Structure. The Building Must Be Completely Canceled, Including All Founding Bodies. Manufacture Of The Replacement New Building As A Schla . More
Refurbishment Of Zinnkopfstraße And Renewal Of The Zellgraben Bridge In Aschau Im Chiemgau
Bridge Engelbosteler, Damm Basic Repair
New Construction Office Building With A Central Control Room And Connecting Bridge To The Existing Building In Lichtenberg At The Ronneburg Location Of Wismut Gmbh; Lot 22: Inner Cleaning Work
Bridge And Under Pass Washing Within The Regional Municipality Of York
2025 Minor Bridge Maintenance
"Rehabilitation Of The Bridge In Mira Miričina"
Works 1. Rehabilitation Of All Weather Road At Cozier, Essequibo Coast, Region No. 2 (Ee: $71,079,162) 2. Construction Of Farm To Market Access Road At Lima, Essequibo Coast, Region No. 2 (Ee: $64,897,833) 3. Construction Of Farm To Market Access Road At Sparta, Essequibo Coast, Region No. 2 (Ee $24,212,748) 4. Construction Of Timber Wharf At Hackney Area, Lower Pomeroon River, Region No. 2 (Ee $33,098,793) 5. Construction Of Timber Bridge At Capoey, Essequibo Coast, Region No. 2 (Ee $ 35,470,450) 6. Construction Of Revetment At Hampton Court, Essequibo Coast, Region No.2 (Ee $36,929,634) 7. Construction Of Drainage Structures At C1-C6, Coffee Grove To Dartmouth, Essequibo Coast, Region No. 2 Lot 1 (Devonshire Castle)(Ee $31,099,300) 8. Construction Of Drainage Structures At C1-C6, Coffee Grove To Dartmouth, Essequibo Coast, Region No. 2 Lot 2 ( Hampton Court) (Ee $31,089,300) 9. Rehabilitation Of Spillweir Farm To Market Road, Canal No.2, West Bank Demerara, Region No.3 (Ee $138,341,700) 10. Construction Of Timber Revetment At Hague Jib, West Coast Demerara, Region No.3 (Ee$ 25,291,875) 11. Construction Of Timber Revetment At Vergenoegen East Sideline, East Bank Essequibo, Region No.3 (Ee $43,251,600) 12. Construction Of Control Structure At Lanaballi, Essequibo River, Region No.3 (Ee$86,830,590) 13. Construction Of Timber Bridge At East Sideline To All Weather Road, Windsor Forest, West Coast Demerara, Region No.3 (Ee$ 16,230,060) 14. Construction Of Control Structure At Super Star Farming Area, Windsor Forest, West Coast Demerara, Region No.3 (Ee$ 37,893,475) 15. Construction Of Control Structure At Second Run Irrigation, Windsor Forest, West Coast Demerara, Region No.3 (Ee# 37,893,475) 16. Rehabilitation Of Access Bridge At Den Amstel/Fellowship, West Coast Demerara, Region No.3 (Ee$ 15,469,545) 17. Rehabilitation Of Access Bridge At Cross Dam, Den Amstel, West Coast Demerara, Region No.3 (Ee$ 14,286,720) 18. Rehabilitation Of Access Bridge At Bamboo Dam, Fell
Supply & Delivery Of Bagasse Logie Carrier Gear Box, Motor And Fluid Drive Coupling At Blairmont Estate. • Replacement Of Auxiliary Carrier Head Shaft And Tail Shaft Sprocket & Bearing For Albion Estate. • Supply And Delivery Of Oil Centrifuge For Albion And Uitvlugt Estates. • Supply And Delivery Of Materials Required For The Fabrication Of New Punts. • Construction Of A New Creek Trench Bridge (Flat Bridge) At Skeldon Estate