393 Live Notices for Europe plastic tenders
Showing 1 to 20
Manufacturing And Delivery Of Brand New Plastic Bags For Miejskie Przedsiębiorstwo Cleaning Sp. Z O. O. In Krakow, Divided Into Three Parts
Delivery Of Flower Pots, Waste Bins, Plastic Containers, Catch Basins, Etc., Divided Into Tasks
Delivery Of Flower Pots, Waste Bins, Plastic Containers, Spill Tubs, Etc. Divided Into Tasks
Contract For Repair Services Using Plastic Welding Of Polyethylene Containers Intended For The Collection Of Household Waste From The Municipality Of Talavera De La Reina At Unit Prices.
Duct With Plastic Pipe Res. Bera, Krume City
Ho-23-04 Framework Agreement Cleaning Agents, Paper And Plastic Products
Zgk/Zp-03/06/2024 "Delivery Of Liquid Fuels: Diesel Oil, Lead-Free Ethylene Pb 95 For The Needs Of Zakład Gospodarki Komunlnej In Lwówek Sp. Z O.O."
Supply And Delivery Of Cationic Polymers For The Saint Denis-Les-Sens Wwtp
24A30447 - Lorup Ammunition Depot - Installation Of Plastic Windows And Aluminum Doors
Plastic Products (For Nurseries)
Cpub006Dte2024 - Acquisition Of Plastic Bags For The “Bio-Waste Separation” Project
New Building Of The Geriatrics Department At The Augusta Hospital In Bochum - Plastic Windows, External Window Sills, Window Sills
Supplies Of Plastic Pipes And Fittings For Południowy Koncern Węglowy S.A.
Supply Of Plastic Waste Bags For The Needs Of The Municipality Of Moschato Tauros
Cardboard And Plastic Waste Press (Without Punch) With Chain Conveyor In The Floor
Blb Nrw D/Düsseldorf (We2473)/D-W-Tal Buschl Nb Rsa And Ts/Ve 316 Plastic Window Work, Sun Protection 065-24-00201
Duct With Plastic Pipe Res. Bera, Krume City
Sodium Chloride Solution 0.9% 100Ml Plastic Bottle
Framework Agreement For The Supply Of Plastic Waste Containers
New Pipeline With High-Density Polyethylene Pipe, Pead 100, Diameter 63 Mm And Pn 16, With A Length Of 2,447 M Between The Existing Network In Sant Julià On The Edge Of The B-400 Road And The Existing Network In Access Road To Vallcebre B-401. The Pipe Will Be Surrounded With Sand Up To A Height Of 0.20 M And The Trench Will Be Filled And Rammed With Material Selected From The Excavation Itself, In Layers Up To 25 Cm Thick, Using A Vibrating Rammer And Compacting The 95% Pm.