58 Live Notices for India tunnels tenders
Showing 1 to 20
Revamping Of Hot Air Generator System For Tunnel Dryer No. 5 (Supply, Installation Andcommissioning Quantity: 1
A/R And M/O To Various Roads Under Sub-Division Ser-12 Of Division Ser-1 Dg. 2024-25. (Sh - Improvement Of Drainage System Of Cv Raman Marg, Mp Road, Ashram Underpass And Sukhdev Vihar Road At Various Location).
Construction Of Storm Water Drain From Shop No.1 To Sangam Park Colony Gate On Swami Narayan Underpass Road Under Pwd Division Nwr-1, Sub-Division Nwr-13 During 2024-25
Procurement Of Fabricated Tank With Tunnel Excavation Simulation Mechanism
Construction Of Feeder Tunnel, Desander, Hrt, Sft, Surge Shaft, Valve House , Adits And Its Appurtenant Works & Associated Project Roads
Construction Of Underground Power House Building, Tail Race Tunnel, Switch Yard And Other Associated Work Of Power House Site, Adits , Mat, Vertical Pressure Shaft & Steel Liner Including Branch Tunnel & Associated Project Roads
Dapi Readymade Solution With Antifade,10 Ml,Tunnel Assay Kit 50 Assays,Apt110 Tunnel Assay Kit 50 A Quantity: 5
Design, Supply, Erection, Testing &Amp Commissioning Of 2X25Kv Ohe For Kalamb (Excl.) (Ch: 39596 M, Km - 797.686 - In Yavatmal (Incl.) (Ch: 78233 M, Km- 836.317 (Phase-2) Section Including Ohe For Tunnel No. 1 (2.45 Km) Between Ch: 55201 - Ch: 57651 (Also Including Provision Of Aec &Amp Bec For Entire Wr-Ytl Section) Of C.Rly. Ngp Division.
Miscellaneous P.Way Works For Track Maintenance In The Tunnels In Jat-Svdk Section In The Jurisdiction Of Sse/P.Way/Mctm Under Aden/Mctm
Miscellaneous P.Way Works For Track Maintenance In The Tunnels In Jat-Svdk Section In The Jurisdiction Of Sse/P.Way/Mctm.
Rs-Tbm - Provision Of Concrete Pathway In Between Stabling Lines In The Yard Of Emu Workshop At Tambaram.
Custom Bid For Services - Wind Tunnel Test For Chimney For 1 X 800 Mw Ntpc Sipat Stpp Stage Iii Quantity: 1
Lt Wire Tunnel-1 Drwg No 7300 12 01 00 00 04,Lt Wire Tunnel-2 Drwg No 7300 12 01 00 00 05,Lt Wire T Quantity: 173
Panel, C2I80Cv2711M2500/Dlz001&Dlz002,Cooling Tunnel 1970X420X300 Mm Ccm# 1/2,Cooling Tunnel 960X42 Quantity: 30
Wind Tunnel Test For Chimney For1 X 800 Mw Ntpc Sipat Stpp Stage Iii
Maintaining/Observation Of Water Level At Reservoir And Clearing Of Grass From Tunnel Face To Reservoir Etc Of Chaba Power House W.E.F. 20.12.2024 To 31.03.2025 (102 Days)
Execution Of Emergency Pathway, Thorough White Washing Of Tunnel, Thorough Replacement Of Defective Rolling Shutter And .
A)Improvement To Sewerage And Drainage System Of Aagwali Chawl,Marimata Chawl,Barrack Lane 1,Barrack Lane 2, Ms Buildings ,Barabunglow Colony Under Aden (N) Lnl B) Improvement To Road Surface At Lc Gate No 23,25,26,27,29,30,31,32,34 Inlnl-Kjt Section Under Aden(N) Lnl Section C)Painting Of All Service Buildings, Fob, Platform Walls, Cop, Fencing &Amp Compound Wall Under Aden(N) Lnl. D)Painting Of Tunnel, Ghat Protective Works, Face Wall Of Tunnels To Pr Corrosion &Amp To Increase The
Augmentation For Quick Watering Arrangements At Tbm Station
Reconstruction Of Tilted Retaining Wall Towards 5Th Line In Waghoba Nagar Of Parsik Tunnel (Csmt End) Approach. Irpsm Id No. 01.02.32.24.3.51.007