69 Live Notices for India tunnels tenders
Showing 1 to 20
Restoration Of Damaged Equipments In Tunnel No. 4 Caused Due To Landslide By Supplying &Amp Installation Of Electrical Assets And Maintenance Of All Assets From Jiribam To Khonsang For A Period Of 24 Months In Connection With Jrbm - Imphal New Bg Line Project.
Items: Vertical Wind Tunnel Training Quantity: 1
Sitc Of Solar Dryer For Chilli Drying And Solar Tunnel Dryer Under Amelioration Of Kahmir Chilli For Food, Nutritional Securing And Income Generation (Nabard) At Kvk Pulwama, Kvk Anantnag, Kvk Kulgam, Kvk Bandipora And Main Campus Shalimar, Skuast-K
Const. Of Walk-In-Tunnel Polyhous Under Amelioration Of Kahmir Chilli For Food,Nutritional Securing And Income Generation (Nabard) At Kvk Pulwama, Kvk Anantnag, Kvk Kulgam, Kvk Bandipora, Urban Technology Park Habbak N Main Campus Shalimar, Skuast-K
Re-Construction of Retaining wall near house of Madan Lal R/o village Badnad Houri Devi in G.P Bagroli (Under SDRF) Deposit work (SH: Construction of Retaining wall at RD. 0/0 to 0/010)
Re-Construction of R-wall near the house of Kushla Devi in village Khudial in G.P. Kutwasi (Under SDRF) Deposit work (SH:- C/o R/wall at RD. 0/0 to 0/010)
Re-Construction of R/wall near Mahila Mandal Bhawan village Kutt in G.P. Kutwasi (Under SDRF) Deposit work (SH:- C/o R/wall at RD. 0/0 to 0/007)
Re-Construction of Retaining wall near house of Gurcharan Singh in village Khudial in G.P. Kutwasi (Under SDRF) Deposit work (SH: C/o R/wall at RD. 0/0 to 0/010)
Re-Construction of R-wall behind house of Balwinder Kaur W/o Rajinder Singh village Kutt in G.P. Kutwasi (Under SDRF) Deposit work (SH: C/o R/wall at RD. 0/0 to 0/007)
Re-Construction of Edge wall near the house of Sudarshan to Ridku Ram Ke Ghar tk village Bassi in G.P. Kutwasi (Under SDRF) Deposit work (SH: C/o R/wall at RD. 0/0 to 0/010)
Re-Construction of Retaining wall near house of Gorkhi Ram in village Bassi in G.P. Kutwasi (Under SDRF) Deposit work (SH:- C/o R/wall at RD. 0/0 to 0/007)
Re-Construction of R-wall near the house of Gurbachan Singh in village Badnad in G.P. Bagroli (Under SDRF) Deposit work (SH:- C/o R/wall at RD. 0/0 to 0/010)
Re-Construction of R-wall near the house of Rakesh Kumari in village Sanaurth in G.P. Bagroli (Under SDRF) Deposit work (SH: C/o R/wall at RD. 0/0 to 0/009)
Construction of Slab on existing U-shape Drain on Hatli Maukhar road at village Loh Near Chakki and Ravinder Kumar House (Under MLALAD) Deposit work (SH:- Construction of Slab on existing U-shape Drain)
Construction of U-Shape drain at Km. 1/315 to 1/345 for MTN road Sohar to Gurial road Km. 0/00 to 2/000
Re-Construction of Retaining wall near the house of Ramesh Singh village Bari in G.P. Hatli (Under SDRF) Deposit work (SH:- Construction of Retaining wall at RD. 0/0 to 0/009.50)
Re-Construction of Retaining wall near house of Vijay Kumar in village Reeng G.P. Thehar (Under SDF) Deposit work (SH: Construction of R/wall at RD 0/0 to 0/009)
Re-Construction of Retaining wall near the house of Narsingh Temple Habitation village Fatehpur G.P Fatehpur (Under SDRF) Deposit work (SH:- Construction of PCC Retaining wall (1st step) at RD. 0/0 to 0/015.60)
Restoration Of Mdr-67 Road From Victory Tunnel To Sanjauli Km 0/00 To 5/12(Sh -Demolition Work, Cc Work, Steel Work, Interlocking Paver Works Etc. In Foot Path Between Rd 4/290 To 4/690).
Restoration Of Mdr-67 Road From Road From Victory Tunnel To Sanjauli Km 0/00 To 5/120 (Earth Work Cc.1 36, Steel Work Etc. For The C/O Gratings, For Drains Constructed Between Rd 3/00 To 4/590).