6 Live Notices for Italy tunnels tenders
Showing 1 to 6
Design Of The New Auxiliary Surface Drain With Tunnel And Reinforced Concrete Channel For The Return Of The Flows Into The Natural Channel Downstream Of The Monte Cotugno Dam, To Compensate For The Insufficient Potential Of The Surface Drains Which Are Not Suitable For The Lamination Of The Flood Flow And For Compliance With The Minimum Safety Clearance (Ntd2014)
Ap386 Design And Construction Of The Construction Lot “Riol River Drainage Tunnel - Lot H81 Fortezza Station”
Underpass North Exit
North Exit Underpass
Expression Of Interest For Possible Supply Of Extensible Tunnel And Modular Tensile Structure
Ap386 Design And Construction Of The Construction Lot “Riol River Drainage Tunnel - Lot H81 Fortezza Station”