15 Live Notices for Luxembourg agriculture tenders
Showing 1 to 15
Collection And Exploitation Of Various Waste From Agriculture, Fruit And Viticulture In The Grand Duchy Of Luxembourg For The Years 2025 To 2029
The Client Intends The Services For The Collection, Transport And Recycling Resp. Disposal Of The Following Waste From Agriculture, Fruit And Viticulture In The Grand Duchy Of Luxembourg: Siloplasty, Stretch Film, Undercoat, Bale Network, Bale Cords, Plastic Cords From Viticulture, "Big Bags" (Lot 1) And Piles From The Wine And Fruit Growing (Lot 2). Comparable Materials From Other Professional Sectors Can Be Excluded From This Collection. The Relevant Contract To Be Concluded Includes The Following Services In Particular: • Establishment And Operation Of A National Coordination Center • Establishment And Operation Of Regional Intermediate Bearings To Accept Waste • Transport Of Waste To The Recycling Resp. Disposal Systems • Users Or Disposal.
Heating And Ventilation And Sanitary Facilities - Heating Pipes> 1690M - Floor Heating> 3230M² - Production Hot Water Domestic> 1 Part Production Domestic Water> 1 Part - Ventilation Installation> 4 Parts (8,000 M³/H/6.500 M³/H/15,000 M³/H/1.500 M³/H) - Ventilation Pipes> 2780M² - 2780M² Ventilation> 890M - Sanitary Devices> 44 Wc; 28 Sinks; 12 Urinals; - 45 Kitchen Sinks; 7 Instant Water Heaters - Sanitary Pipes> 1300M - Setting Equipment Regulation, 2 Electric Tables, 20.100M Wiring - 1 Piece Rainwater Recovery System - Special Equipment> 1 Double Boot Washing System - Fire Stations> 37 Pieces
Interior Joinery Work With 39 Interior Doors (Wood And Metal In A Historic Setting), Lockers For Changing Rooms, Wc Separation Partitions. The Duration Of The Work Is 45 Working Days, To Start The 3Rd Half Of 2025. The Work Is Sold At Unit Prices.
The Project Consists Of The Migration Of The It Room Of The Thermal Domain: Creation Of The New It Room With Implementation Of New Racks, A New Extinction Center; Implementation Of Ups And Air Conditioning Cabinet; Creation Of A False Technical Ceiling And Partitioning Of The Premises; Deviation Of Network Cables And Implementation Of New Connections (Fo And Copper) The Duration Of The Work Is 35 Working Days, To Start During Week 44 In 2025. The Work Is Sold At Unit Prices.
Assignment The La Commune The Rice Den
Multimodal Exchange Center At Hollerich Station - Preparatory Work - Application Phase
- As Part Of The Construction Of The New Exchange Center Of The Hollerich Station, The Société Des Chemins De Fer Luxembourg (Cfl) Projects The Realization Of A Series Of Preparatory Work Before The Launch Of Construction Works. - This Market Relates To The Realization Of Clearing, Uprooting, Replanting Of Vegetation And Implementation Of Specific Arrangements Within The Framework Of Imposed Compensatory Measures. These Interventions Are Essential To Prepare The Surfaces Before The Launch Of Construction Work. - The Work Will Take Place In Several Phases, Depending On The Areas Concerned, And Partly Along The Railways. Compensatory Measures Will Include The Replanting Of Suitable Vegetation In Order To Replace Affected Plant Spaces And Preserve The Ecological Balance Of The Site.
With The Expansion Of The Hospital At The Kirchberg Location, The Hôpitaux Robert Schuman (Hrs) Realizes The Construction Of An Innovative And Future-Oriented Outpatient Clinic And Care Center, Which Includes Areas For Nephrology, Dialysis, Geriatrics, General Care, But Also Areas For Practices, Administration And Logistics. The Implementation Takes Place In The Area Of Today'S Administrative Building In The Form Of A New Tower With 17 Levels And A Comprehensive Renovation Of The Inventory To Expand The Central Surgery During Operation. The Subject Of The Order Is The Services Of Building Physics In Accordance With Hoai Appendix 1 As Part Of The “Nouvelle Construction Site Kirchberg” Project (Hereby Abbreviated Nsk).
The Work Concerns 55 (8.75M2) And 34 (3.75M2) Metallic Windows Which Will Be Installed In The Historical Heritage As Well As The Preparatory Work (Leveling And Sanitation Of Sandstone Embrasures) For The Installation Of The Windows. The Duration Of The Work Is 165 Working Days, To Be Started In September 2025. The Work Is Sold At Unit Prices.
The Market Consists Of The Provision Of An All -Risk Site Insurance Contract (Trc). The Contract Will Cover Sections 1 "Thing Insurance - Damage And Losses", 2 "Responsibility Insurance" And 3 "Damage To Existing Goods". The Duration Of The Services Is 57 Months To Start The 1St Half Of 2025. The Services Are Sold At Unit Prices.
The Contracting Authority Provides For The Replacement Of Insulator Channels (Material Provided By The Contractoring Entity) On The Following High Voltage Lines: • L6114: 2X 110 Kv Flebour-Ingeldorf, • L6104: 1X 110 Kv Ingeldorf- Stauséi, • L6105: 1X 110 Kv Stored.
Kitchen Facilities Work On Behalf Of Servior As Part Of The Project To Build The New Household House At -3743 Rumelange. Large Work: Installations Of A Production Kitchen For Approx. 250 Meals/Day, Refrigeration Installations, Hoods, Hot And Cold Kitchen Furniture, Bar/Restaurant Installations, Distribution Kitchens, Equipment.
Kitchen Installation Work (Ve 4710) - New Household House In Rumelange
Concrete: 100 M3 Reinforcements: 45 To Micropiles: 350 M Predalles: 140 M2 Sealing Complex: 365 M2