45 Live Notices for Luxembourg building tenders
Showing 1 to 20
Chl Nbc Ve4100 Building Automation
The Order Includes The Entire Building Automation System Consisting Of Field Devices, Automation Stations, Room Automation, Fire Damper Detection And Control System, Passive Network Components, Building Management Technology, Control Cabinets, Cabling And All Other Ancillary Services Of The Building Automation Systems. The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4100 Building Automation" For The New Center Building And Its Annexes (Nouveau Bâtiment Centre) Of The Chl: Building Automation Installations: - Approx. 6,000 Field Devices - 88 Bacnet/Sc Automation Stations - 290 Room Automation Controllers - Approx. 1,600 I/O Modules Of The Room Automation - 55 Control Cabinets - Approx. 400 Km Of Cables And Lines - 1 Fire Damper Detection And Control System With Approx. 1,700 Motor Modules - Bms Software In Redundant Version - Energy Monitoring Software
6004 - Demolition Work - Phase 5 For The Neischmelz Project In Dudelange
Construction Of The New Resource Centre In Kehlen
Roofing And Waterproofing Work, Sheet Metal Work And Ventilated Wooden Façade To Be Carried Out In The Interest Of The Police And Administrative Building In Wiltz – New Construction
Wood Construction Work, Insulation, Waterproofing, Sheet Metal Work And Wood Cladding - Maison Relais Alzingen Am Duerf
2571 - Elevator Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
2571 - Elevator Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
Extension Of The "Parc Housen" School Complex - Creation Of 2 New School Buildings For The Needs Of Cycles 1 And 2-4 - Covered Enclosure Works
2571 - Hvac And Sanitation Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
2571 - Construction Work In Enclosed And Covered Wood (Including Wood And Metal Framework Work, Thermal Insulation, Waterproofing, Exterior Joinery, Facade, Finishing And Ironwork) - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
The Project Consists Of The Construction Of A New Building As Well As The Transformation And Renovation Of Existing Buildings. - Installation Of 42 Ventilation Units, 2 Heat Pumps, +/- 700 Radiators/Convectors, +/- 5,400 M2 Of Underfloor Heating And +/- 4,900 M2 Of Cold Ceiling - Sanitary Installation, Production, Distribution And Sanitary Equipment. - Low Voltage And Low Current Electrical Installation, +/- 26 Tgbt Cells, +/- 150 Secondary Panels, Lighting, Equipment, Video And Sound System. The Duration Of The Works Is 1368 Working Days, Starting In The 2Nd Half Of 2025. The Works Are Awarded At Unit Prices.
Design & Build Services - Construction Of Passenger Reception Facility, .
Construction Of Administrative Building And Associated Infrastructure In Latvia
A320 Family & G650Er Cabin Crew Training Services Project
Screed And Tiling Work To Be Carried Out As Part Of The Construction Of A Set Of 3 Housing Projects In Rue De La Lavande And Rue Des Lilas In Luxembourg-Kirchberg
C-295 Flight Simulator & Training Center Design And Build
Construction - School Complex "Haus Um Kiemel" - In Wincrange
2435 - Roofing / Framework Work - Construction Of 6 Two-Family Houses Located On Rue Bréil In Greiveldange
The Contract Includes The Entire Steam Supply Systems, I.E. Primary Steam And Pure Steam Installations Consisting Of Primary Steam And Pure Steam Generators With Exhaust Systems In The Central Units With Appropriate Water Treatment, As Well As The Complete Steam/Pure Steam Distribution With Fittings Such As Shut-Offs, Condensate Drains, Etc., As Well As All Other Ancillary Services Of The Steam Supply Installations. The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4090 Steam Supply Installations" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Centre) Of The Chl: Steam Supply Installations: - Main Center "Heating Center" With 2 Steam Boilers Approx. 2,000 Kg/H (9 Bar), With Associated Feed Water Degassing Approx. 3,000 Liters, Suitable Expansion And Heat Recovery Unit, As Well As Fittings And Accessories - 3 Sub-Centers With Pure Steam Generators Of 2 X Approx. 1,170 Kg/H (Steam Humidification Air Handling Units) And 1 X 540 Kg/H (Central Sterilization), With Fittings And Accessories - Approx. 760 M Steam Piping System Dn15 To Dn250 Complete With Molded Parts Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 735 M Of Condensate Stainless Steel Piping System Dn15 To Dn125 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 1,800 M Of Pure Steam And Condensate Piping System Dn15 To Dn100 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories