9 Live Notices for Luxembourg chemicals tenders
Showing 1 to 9
Epc Project For 5Mw Hydrogen Production Unit - Luxhyval
Road Redevelopment Works As Well As Supply And Evacuation Networks Of Rue Louis Petit Between Rue Victor Hugo And Rue Hoferlin And Rue Dominique-Joseph Hoferlin Between Rue Michel Rodange And Rue Large. Large Of The Work: The Works Essentially Consist In Renewing The Underground Infrastructure As Well As Surface Coverings. • Road / Sidewalks Surface: Approximately 4,200 M2 • Trench Earthworks: Approximately 8,250 M3 • Hydrocarbon Coated: Approximately 850 Tb • Supply Materials: Around 7,000 M3 • Concrete Tiles 30 X 30 X 8/12 For Sidewalks: Approximately 1,850 M2 • Civil Engineering Work For Gas Driving (Excluding Connection): Approximately 660 Ml • Civil Engineering Work (Excluding Connection): Approximately 660 Ml • Eu/Ep Pipes: Approximately 640 Ml • Trench Linear For Variety Of Networks: Approximately 660 Ml Start/Predictable Duration Of Work: September 2025/350 Days
Volume Of Work: Hydrocarbon Coated: 5,350 Tb; Borders Pose: 1400 M; Place Of Cobblestones: 1,700 M, Stabilization Of Career Crusions: 1450 T
- Volume Of Work: Road Milling: 59,800M2; Hydrocarbon Coated: 8,025 To
- Volume Of Work: Road Milling: 59,800M2; Hydrocarbon Coated: 8,025 To
Provision Of Cleaning Compound,Solvent
Asbilner Of ° 2 Unifamilial Residential Houses; ° 13 Twin Residential Buildings; ° 4 Buildings With Garages. - 15 Confined Zones, Applications: Bituminous Waterproofing Layers, Maticing Windows, Stallifuges, Flooring With Glue - Preparatory Work (Clearing And Partial Excavation, Etc.) - Other Depollution (Removal Insulation In Fma) - Waste Management. The Duration Of The Work Is 150 Working Days, To Start Informed Of The 2Nd Half Of 2025.
Volume Of Work: Hydrocarbon Coated: 5,350 Tb; Borders Pose: 1400 M; Place Of Cobblestones: 1,700 M, Stabilization Of Career Crusions: 1450 T
The Order Includes The Central Water / Permeat Preparation, As Well As The Associated Concentration Supply For The Dialysis Treatment Of Patients Of The Chl Nbc. The Water / Permeate Preparation Is Carried Out Redundantly 2 X 100% And Each Includes The Coarse Filter, Softening System, Activated Carbon Filter, Fine Filter With Double Reversal Osmosis System And Switchover Unit. The Processing Is Scheduled For The Processing With Hot Cleaning Up To The Dialysis Places Or Technician Places Included. For Dialysis Treatment, The Concentration Supply For 3 Concentrates From The Headquarters To The Dialysis Places Is Also Planned. These Installations Also Include All The Necessary Fittings, Shut-Off And Check Valves, System Separator, Measured Value Provider, Etc., As Well As The Associated Measuring Systems With Switching And Control Cabinets Including Cabling, As Well As All Other Side Services Of The Aforementioned Installations. The Order Includes The Following Work: The Services Or Quantities Listed Below Must Be Carried Out As Part Of The Work For The "Ve4011 Sanitary-Dialysis Care" For The New Center Building (Nouveau Bâtiment Center) Of The Chl: Sanitary-Dialys Care - Installations:- Center With 2 X 100% Dialysis Water Preparation, Consisting Of Coarse Filter, Fine Filter, Softening Systems, Activated Carbon Filters, Double Reversal Osmosis System With An Output Of Approx. 2,000L/H. -Desinfection Devices.