8 Live Notices for Luxembourg oil and gas tenders
Showing 1 to 8
Augmenter Fuel Control Test Stand
The Contract Includes All The Systems In The Cost Groups Of Wastewater And Water Systems, Consisting Of Wastewater And Rainwater Pipes, Lifting Systems, Water Treatment Systems, Pressure Boosting Systems, Pipelines, Water Heaters And Sanitary Objects As Well As Installation Blocks. The Sanitary Equipment Of The Prefabricated Wet Rooms In The Bedrooms Is Not Part Of This Tender. The Contract Includes The Following Work: The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4010 Sanitary Installations" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Centre) Of The Chl: Wastewater And Water Systems / Sanitary Facilities: - Wastewater Systems - Approx. 16,500M Of Cast Iron Wastewater Pipes And Ventilation Pipes For Wastewater And Medicinal Wastewater - Approx. 400M Of Wastewater Pipes And Ventilation Pipes - Double Pipe System With Insulation And Lead Foil For Radioactively Contaminated Wastewater - Approx. 250M Of Cast Iron Wastewater Pipes For Fire Water Retention With Fittings And Accessories - Pp Safety Basin For Wastewater From The Decontamination System In The Rescue Hall - Approx. 500M Of Cast Iron Wastewater Pipes For Fire Water Retention Helicopter Landing Pad With 2 Fire Water Retention Basins, Fittings And Accessories - Approx. 400M Of Cast Iron Wastewater Pipes For The Kitchen Area, And Grease Separator Ns 20 With Lifting System - Approx. 350M Of Waste Water Pipes Made Of Pe-Hd For The Dialysis Area - 7 Waste Water - Faeces-Free And Faeces-Loaded Lifting Systems With Approx. 400M Of Pressure Pipes Made Of Stainless Steel, Fittings And Accessories - Approx. 6700M Of Rain Water Pipes Made Of Cast Iron - Gravity Drainage - 10 Rain Water - Lifting Systems With Approx. 230M Of Pressure Pipes Made Of Stainless Steel, Fittings And Accessories - Water Systems - House Connection With Uv Disinfection Systems,
- Asbestos Removal (1 Confined Area, Applications: Embedded Asbestos-Cement Elements) - Site Cleaning (Clearing, Collection Of Various Non-Contaminated Waste, Asbestos-Cement Elements, Etc.) - Cleaning Of Existing Buildings (Dismantling Of Various Installations) - Deconstruction Of Existing Buildings Into Asbestos-Cement, Reinforced Concrete, Wood And Steel Elements: O Piggery Building Called "Stall": Approx. 11,700 M³ On Approx. 1,225 M² Base, Including Tank Below The Building O Annex Building Called "Schuppen": Approx. 1,400 M³ On Approx. 280 M² Base - Removal Of Asphalt Coating, Removal Of Fuel Tank - Backfilling Of Excavation - Waste Management Expected Duration: - Asbestos Removal In Confined Area: Approx. 10 Days - Deconstruction Including Asphalt Removal And Backfilling: Approx. 3 Months Execution Period: - April – June/July 2025
Electrical/Diesel Forklifts And Electrical Elevating Platforms.
Insp + Rep Of Fuel Control,Main,Turbine Engine For Ab206A
Technical Assistance For Offshore Wind Feasibility Study
Technical Assistance For Offshore Wind Feasibility Study
Technical Assistance For Offshore Wind Feasibility Study