Expected Start Of Work: 01.04.2025. Duration Of Work: 400 Working Days.
The Start Of The Works Is Scheduled For Mid-March 2025. The Duration Of The Works Is 250 Working Days. Scope Of Works: - Earthworks: 1900 M2 - Embankment Works: 3800 M3 - Asphalt Works: 100 M2 - Paving Works: 900 M2 - Works For Various Networks: 500 M - Water Pipe Works: 340 M - Wastewater Pipe Works: 315Pp 120M 500Pp 200M
Infrastructure Works In Beggen Street