12 Live Notices for Luxembourg water and sanitation tenders
Showing 1 to 12
Supply Of Security Containers For Sofcom
2571 - Hvac And Sanitation Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
Hvac-Sanitary Installation Work (Air/Water Heat Pump In Cascade; Electric Dhw Boilers; Underfloor Heating/Radiators; 4000 M3/H Cta; Sanitary Installation And Equipment) As Part Of The Construction Of A Nursery (Renovation With Extension) In Diekirch.
The Project Consists Of The Construction Of A New Building As Well As The Transformation And Renovation Of Existing Buildings. - Installation Of 42 Ventilation Units, 2 Heat Pumps, +/- 700 Radiators/Convectors, +/- 5,400 M2 Of Underfloor Heating And +/- 4,900 M2 Of Cold Ceiling - Sanitary Installation, Production, Distribution And Sanitary Equipment. - Low Voltage And Low Current Electrical Installation, +/- 26 Tgbt Cells, +/- 150 Secondary Panels, Lighting, Equipment, Video And Sound System. The Duration Of The Works Is 1368 Working Days, Starting In The 2Nd Half Of 2025. The Works Are Awarded At Unit Prices.
Extension Of The Beggen Sewage Treatment Plant – Construction Of The Work Vorklärung
Extension Of The Beggen Sewage Treatment Plant – Construction Of The Work Vorklärung
Procedure Opened For The Supply Of 2,520,000 Kg Of Methanol Ch3Oh For The Needs Of The Beggen Wastewater Treatment Plant.
The Contract Includes The Entire Steam Supply Systems, I.E. Primary Steam And Pure Steam Installations Consisting Of Primary Steam And Pure Steam Generators With Exhaust Systems In The Central Units With Appropriate Water Treatment, As Well As The Complete Steam/Pure Steam Distribution With Fittings Such As Shut-Offs, Condensate Drains, Etc., As Well As All Other Ancillary Services Of The Steam Supply Installations. The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4090 Steam Supply Installations" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Centre) Of The Chl: Steam Supply Installations: - Main Center "Heating Center" With 2 Steam Boilers Approx. 2,000 Kg/H (9 Bar), With Associated Feed Water Degassing Approx. 3,000 Liters, Suitable Expansion And Heat Recovery Unit, As Well As Fittings And Accessories - 3 Sub-Centers With Pure Steam Generators Of 2 X Approx. 1,170 Kg/H (Steam Humidification Air Handling Units) And 1 X 540 Kg/H (Central Sterilization), With Fittings And Accessories - Approx. 760 M Steam Piping System Dn15 To Dn250 Complete With Molded Parts Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 735 M Of Condensate Stainless Steel Piping System Dn15 To Dn125 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 1,800 M Of Pure Steam And Condensate Piping System Dn15 To Dn100 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories
Redevelopment Of The Cr142 Over A Length Of 650 Meters With Development Of Sidewalks. Installation Of Wastewater, Mixed And Rainwater Collectors, Installation Of The Drinking Water Network And Installation Of Dry Networks On The Same Section. Installation Of The Mixed Water Collector In Reinforced Concrete Ø400 Over A Length Of 535 Meters And In Cast Iron Over A Length Of 38 Meters And The Rainwater Collector In Reinforced Concrete Ø300 Over A Length Of 230 Meters.
The Start Of The Works Is Scheduled For Mid-March 2025. The Duration Of The Works Is 250 Working Days. Scope Of Works: - Earthworks: 1900 M2 - Embankment Works: 3800 M3 - Asphalt Works: 100 M2 - Paving Works: 900 M2 - Works For Various Networks: 500 M - Water Pipe Works: 340 M - Wastewater Pipe Works: 315Pp 120M 500Pp 200M
Chl Nbc Ve4010 Sanitary Installations
Hvac & Sanitary Installation Work