Similar tenders from other countries.
Showing 1 to 20
Development Of The Financial And Economic Part Of The Concept For The Transfer Of Railway Freight Stations Hamza, Tashkent, Tukimachi, Salar Outside The Territory Of The City Of Tashkent
Acquisition Of Road Devices For The Alentejo Line - Poceirão Bombel Duplication
Ask For Price Information For The Delivery Of The Door Locking Switch To The Wagons
Price Research - Designing, Delivery And Assembly Of A Photovoltaic Installation With A Capacity Of Up To 50 Kw (Along With An Energy Magazine) At The Point Of Maintenance Of The Rolling Stock In Zbąszynek At Ul. Kolejowa 8 (Group 800)
Services Relating To Oess (Onboard Energy Storage Systems)
Vrd Frame 2025-2028
"The Renewal Of The Park Of Vehicles Intended For Public Transport By Acquiring A Number Of 22 Trolleybuses From The Range Of 12 M With A Autonomy Of At Least 20 Km"
File Of Buildings: 1) “Reconstruction Of The Mostecky Head At The Obsto Railway Station To Secure The D4 Load Class” 2) “Reconstruction Of The Počerad Head At The Obrnice Railway Station To Ensure The D4 Track Class”
Delivery Of A Video Monitoring System (Smw) To 105N Trams And Derivatives, 123N, 123N/1, 112N, 116Na And 116Na/1 With Software
Ku.241/Pn14_2025/Kk - Successive Deliveries Of Mechanical And Rubber Parts For Modeus, Pesa, Skoda And 105/Was Trams Broken Down Into 7 Tasks
Construction Of A Set Of Overlay Turnouts
Delivery And Implementation Of The Track Automation System (Aot)
Performing Technical Support For 15 Highway Electric Locomotives Siemens X4-E-Lok-D Series 1080-Smartron For A 9-Year Period.
Framework Heavy Maintenance Components (Tuk) - Dosto
Feasibility Study Related To The Investment Objective "Modernization/Rehabilitation Of 47 Railway Stations In Romania" - Regional Branch Cf Cluj - 8 Lots
Professional Service Support Of Gaiaose For The Technical Evaluation Of Happened And Non -Reduced Railway Railway Material
Performance Of Construction Works On The Railway Line No. 7 Episode Warsaw Wawer - Otwock As Part Of The Project Entitled: "Works On The Railway Line No. 7 Warsaw Wschodnia Passenger - Dorohusk On The Section Warsaw - Otwock - Dęblin - Lublin, Stage Iib" (Warsaw Wawer - Otwock)
Tr1510, 380 Kv Lingo -Mettlen, Renovation Overhead Line (Mast Foundations), 1510X001 - 1510X148
Tr1510, 380 Kv Lingo -Mettlen, Renovation Overhead Line (Mast Foundations), 1510X001 - 1510X148
Tr1510, 380 Kv Lingo -Mettlen, Renovation Overhead Line (Mast Foundations), 1510X001 - 1510X148