319 Live Notices for Poland architecture tenders
Showing 1 to 20
Design And Construction Of A Photovoltaic Installation For Public Utility Facilities In The Bobowo Commune
13/Da/Tr/24 Development Of Design Documentation And Obtaining A Valid Building Permit For The Project "Construction Of A High-Efficiency Gas Cogeneration System With A Capacity Of At Least 1.598 Mwe In The Stocznia Boiler Room"
Wd/Tp/241113/1 Substantive Support, Control Of The Correctness Of Data Collected As Part Of The Identification Of Operational Characteristics Of Surfaces On Provincial Roads Administered By Zdw In Katowice In The Silesian Voivodeship, The So-Called Consultant.
Mr.260.9.2024.Ww Purchase, Delivery And Assembly Of Furniture And Interior Design Equipment Typical Of The Mill Building As Part Of The Investment Project Entitled: "Revitalization Of The Rothera Mills On The Mill Island In Bydgoszcz" For The Purpose Of Purchasing And Assembling Furniture, Equipment And Interior Design Equipment Of The Flour Granary And The Mill - Stage 1B / Furniture And Typical Interior Design Of The Mill Building.
Carrying Out A Comprehensive Study Of Two Soil Improvement Agents For The Client.
Ir\19\2024 Technical Assessment Of The Design Documentation Of The Investment "Reconstruction And Arrangement Of Selected Interiors For Cultural Activities In The Main Building Of The Karol Lipiński Academy Of Music In Wrocław" - Stage Ii.
"Construction Of A Biogas Plant For Processing Sewage Sludge And Bio-Waste As Part Of The Sewage Treatment Plant In Bytków"
Development Of Design Documentation For The Construction Of A Sanitary Sewage System In Podlaska Street In Luboń.
Technological Wastewater Quality Tests
Supervision Over The Design And Implementation Of Works And Management Of The Contract Entitled "Design And Extension Of National Road No. 9 On The Skaryszew Section - To The Beginning Of The Iłża Bypass From Km Approx. 20+700 To Km Approx. 32+900 Together With The Construction Of The Skaryszew Bypass. Section 1. Design And Construction Of The Skaryszew Bypass Section 2. Design And Extension Of Dk9 From Km Approx. 20+700 To Km Approx. 32+900"
Extension And Reconstruction Of The District Hospital Building In Radomsko In Order To Create New Locations For Long-Term And Geriatric Care
Organizing Sewage Management In The Area Of The Three Ponds Valley – Stage Ii – Construction Of A Sanitary Sewage System In The Area Of Francuska Street And Three Ponds In Katowice
Performing The Function Of Contract Engineer Along With Multi-Discipline Investor Supervision Over The Implementation Of The Investment Entitled Construction Of The Mental Health Center For Children And Youth At The J.Gromkowski Provincial Specialist Hospital In Wrocław
Execution Of Construction Works Phase I At The Park And Ride P+R Połczyńska Car Park In Warsaw
Design And Execution Of Construction Works For The Project Entitled: Revitalization Of Railway Line No. 318 On The Srebrna Góra-Bielawa Zachodnia Route From Km 12.380 To Km 24.300.
,,Preparation Of Design Documentation And Construction Works Related To Photovoltaic Systems, Solar-Wind External Lighting System With Back-Up Based On Central Energy Storage Powered By Renewable Energy Sources (Pv) On The Premises Of The Upper Silesian Medical Center Named After Prof. Leszek Giec Of The Silesian Medical University In Katowice''
Design, Construction And Launch Of The Cogeneration Plant For Mineralization Of Residual Municipal Waste (Imok) In Wysokie Mazowieckie
Providing Comprehensive Investor Supervision Services During The Implementation Of The Investment Project Entitled "Construction Of A Thermal Waste Treatment Plant With Energy Recovery As An Element Of The Green Transformation Centre In Opole".
Successive Execution Of Design And Construction Works Consisting In Making Connections Or Low-Voltage Lines For The Purpose Of Connecting New Recipients On The Premises Of Pge Dystrybucja S.A. Łódź Branch In The Area Of Operation Of Re Piotrków Within The Municipalities Of Tuszyn, Dłutów, Czarnocin, Grabica, Moszczenica And Będków.
41/24 “Implementation Of The Functional-Utility Program (Pfu) For The Renovation And Modernization Of The Premises Of The Zlo At Ul. Sygietyńskiego 3 (Commercial Premises U-1) In Warsaw”, Belonging To The Capital City Of Warsaw, Pl. Bankowy 3/5, 00-950 Warsaw, Administered By The Real Estate Management Plant In The Praga-Południe District Of The Capital City Of Warsaw, Ul. Walewska 4, 04-022 Warsaw, Rented By The Independent Complex Of Public Open Healthcare Facilities Warsaw Praga Południe With Its Registered Office At Ul. Krypska 39, 04-082 Warsaw, And Participation In The Preparation Of The Procedure For The Selection Of The Contractor For The Design And Construction Works, Including Providing Answers To Questions From The Participants Of The Procedure.