Similar tenders from other countries.
Showing 1 to 20
Piping Installation In The Wind Tunnel Laboratory
Piping Installation In The Wind Tunnel Laboratory
Bim Abs 36 Brenner -Nordtlauf - Extended Planning Space - Object Planning Transport Facilities, Kib, Tunnels; Lph 1+2, Option: Lph 3+4/6+7
Supervision Of The Routing Tunnel In Road Mode
Gw 2A Underpass Josef-Huber-Gasse-Local Building Supervision
Geologically Geotechnical Accompaniment To The Construction Of Two -Pipe Tunnels Vodriž And Pusta Gora And Several Geotechnical Structures On The Route E At The New Road Link From The Velenje South Connection To The Slovenj Connection
Mda Central Station Ve 2270 - Dismantling Extension Posttunnel Including Construction Period. Elevator (Steel Construction)
Acquisition Of Automatic Thermoencolhible Packaging Machine: Automatic Sealer With Tunnel Shrinkage Oven, With 24 -Month Warranty. All According To Conditions, Quantities And Requirements Established In The Notice.
South Shan County - Country Of The Nation - T002 (Nine Two Mounts) Large-Scale Collapse Of Flood Tunnels In Selected Areas Of Soil And Water Conservation
Fse713 Tunnel Painting E4 Bypass Stockholm
Competition For The Establishment Of Snow Screens At The Sørskarstunnelen- County Road 7770_Troms County
The Purpose Of This Project Aims To Comply With Rail And Travelers At Troisvierges Station. This Project Includes, Among Other Things, The Following Work: - Construction Of Quays, Railway Platforms, A Bus Station, A Traveling Building, Marquesas As Well As Relative Access (Bridge (S) / Underground (S)); - The Development Of A New Site For The Infrastructure Maintenance Service (Mi) With A New Building; - The Creation Of A New Rail Link North Of The Threevierges Station Through A New Tunnel And Widening Of The Existing Tunnel Template. This Call For Applications Concerns The Project Management Mission In Technical Engineering For The Global Project And For The Phases: - Summary Preliminary Draft (Aps); - Detailed Preliminary Draft (Apd); - Submission (Sou); - Execution Studies (Exe); - Management, Control And Monitoring Of Work (Cha); - Receptions And Commissioning (Ess); - Final File (Def).
The Purpose Of This Project Aims To Comply With Rail And Travelers At Troisvierges Station. This Project Includes, Among Other Things, The Following Work: - Construction Of Quays, Railway Platforms, A Bus Station, A Traveling Building, Marquesas As Well As Relative Access (Bridge (S) / Underground (S)); - The Development Of A New Site For The Infrastructure Maintenance Service (Mi) With A New Building; - The Creation Of A New Rail Link North Of The Threevierges Station Through A New Tunnel And Widening Of The Existing Tunnel Template. This Call For Applications Concerns The Project Management Mission In Civil Engineering With Integrated Piloting For The Global Project And For The Phases: - Summary Preliminary Draft (Aps); - Detailed Preliminary Draft (Apd); - Submission (Sou); - Execution Studies (Exe); - Management, Control And Monitoring Of Work (Cha); - Receptions And Commissioning (Ess); - Final File (Def).
The Purpose Of This Project Aims To Comply With Rail And Travelers At Troisvierges Station. This Project Includes, Among Other Things, The Following Work: - Construction Of Quays, Railway Platforms, A Bus Station, A Traveling Building, Marquesas As Well As Relative Access (Bridge (S) / Underground (S)); - The Development Of A New Site For The Infrastructure Maintenance Service (Mi) With A New Building; - The Creation Of A New Rail Link North Of The Threevierges Station Through A New Tunnel And Widening Of The Existing Tunnel Template. This Call For Applications Concerns The Architect'S Mission For The Global Project And For The Phases: - Summary Preliminary Draft (Aps); - Detailed Preliminary Draft (Apd); - Submission (Sou); - Execution Studies (Exe); - Management, Control And Monitoring Of Work (Cha); - Receptions And Commissioning (Ess); - Final File (Def).
25-010 Microtunneling Subcontractors For Microtunneling Works
Vibration Monitoring - L191, Stadtunnel Feldkirch - Mainly
Civil Engineering Level Crossing System Estw Niederrhein Along The 2330 Route
Expansion Rrb Trift Hagenah
Pilot Mobile Pre-Hoehen Control Tunnel Nok Lfd.-No. 015 Ki25 Lbv-Sh
Passenger Underpass And Platforms Including Deep And Superstructure From Friedberg B. Augsburg, Str. 5382