37 Live Notices for SAARC tunnels tenders
Showing 1 to 20
Consultancy Services As Ae For Supervision During Om Period For (I) Rangpo Viaduct (Ii) Rhenock-Rorathang-Pakyong (Iii) Chisopani Tunnel (Iv) Singtam- Tarku) And (V) Tarku-Ravangla In The State Of Sikkim (2Nd Call)
Construction Of New 4 Lane With Paved Shoulder From Dareota Village To Kalar Bala Village Of Nh-205 (Design Chainage Km.33.175 To Km 41.000 Design Length 7.825 Km) Including Twin Tube Tunnel Packageiib In Himachal Pradesh Under Nh (O) On Ham
Items: Tunnel Air Cooler Large Size Quantity: 2
Design, Supply, Erection, Testing &Amp Commissioning Of 1X25 Kv, 50 Hz, Single Phase, Traction Over-Head Equipment, Switching Station, Scada, Pole Mounted Ssp, Including Ohe In Tunnels And Other Associated Works Between Section Bhanupalli - Dharot 20 Rkm / 37 Tkm Of Ambala Division In Northern Railway In The State Of Punjab And Himachal, India
Supply, Erection, Testing And Commissioning Of 25 Kv Feeder Line Cable And Associated Works In Tunnel (T-80) And Open Route For Railway Electrification In Banihal-Baramulla Section (138Tkm/201Tkm) Under Re(Usbrl) Project Of Northern Railway
Construction Of Cast-In-Situ Box Tunnel In Rock Falling Location In Between Ch. 7.660 Km To Ch. 7.890 Km From Hansdiha And Making Suitable Di Line In Connection With New Bg Line Between Hansdiha And Godda.
Ms-Vm Section: Elimination Of Fish-Plated Joint By Welding In Aden/Tbm And Aden/Cglsub-Division.
Construction Of Cast-In-Situ Box Tunnel In Rock Falling Location In Between Ch. 7,660 Km To Ch. 7,890 Km From Hansdiha To.
Shifting Of Ohe Mast At Km-130/347 Between Tgr-Iii & Tgr-Ii On Uprd Of Tunnel No.5C In Ne Ghat Section In Mumbai D.
Supply, Installation, Commissioning, Training And Demonstration Of “Coke-Making Tunnel Furnace”
Items: Spray Wash Tunnel For Animals Quantity: 1
Supersonic Wind Tunnel Facility Quantity: 1
Led Route Indicator,Led Unit Violet,Led Unit Green,Led Unit Red,Violet Led Unit For Tunnel Section, Quantity: 403
Khnp-Klbg Section: Strengthening Of Tunnel Walls At Trolley Refugees In Tunnel And Construction Of Side Drains At Tunnel.
Repairs And Maintenance Of Tunnel No. 01 To 36, Cleaning Of Side Drains Inside Tunnel, Catch Water Drain Cleaning And Cutting Of Jungle Over Tunnels In Koraput-Rayagada Line Under The Jurisdiction Of Assistant Divisional Engineer/ Lakshmipur Road Of Waltair Division.
Khnp-Klbg Section: Strengthening Of Tunnel Walls At Trolley Refugees In Tunnel And Construction Of Side Drains At Tunnel Approaches.
Construction Of Box Tunnel And U- Through On Pile Foundation Including Slope Protection Measures By Providing Touch Piles On Hill And Valley Side Between Ch 39.302 Km To 39.457 Km In Connection With Dimapur(Dhansiri)- Kohima(Zubza) New Bg Railway Line Project.
Carrying Out Portal Painting Of 23 Nos Of Tunnels In Srren/Kawr Region Of Krcl
Appointment Of Authority Engineer For Providing Project Management Services For Design, Procurement &Amp Construction Of Rcc Box Metro Tunnel Including Birati Ug Station Building &Amp Subways (With Entry-Exit Structures) For Two Underground Metro Stations (Birati &Amp Michael Nagar) By Cut &Amp Cover Method (Top Down With Diaphragm Wall/ Bottom Up Method With Support Arrangement) Including Architectural Finishing, Firefighting, Water Supply, Sanitary Installation, Drainage &Amp Blt
Improvement Of Drainage At Ramtirth Tunnel Top At Km:572/1-9 Between Honnavar-Manki Section, Under Sse/P.Way/Btjl Section