201 Live Notices for South East Asia minerals and mining tenders
Showing 1 to 20
Lifting/Transportation Equipment Rental Services: CATERPILLAR FORKLIFT 2.5 Ton Rental Period 12 months Franco Timika
Spark Analyzer SBU Mineral
Automatic Titrator SBU Mineral
SUPPLY ONE (1) EXCAVATOR UNIT (GRAVE DIGGING MACHINE) FOR THE USE OF PUTRAJAYA CORPORATION IN TAMAN SELATAN, PRESINT 20, PUTRAJAYA
SUPPLYING, DELIVERING MINERAL WATER FOR THE MAIN SPORTS CONTINENT OF THE KPT AND THE 2025 MASUM SPORTS CARNIVAL, FOR THE SPORTS AND CULTURE CENTER, UNIVERSITY, TUN HUSSEIN ONN UNIVERSITY OF MALAYSIA
Bidding Package: Supplying Sieve Factory Equipment; Water Pumps; Mine Stations; The Transformer Station Serves Production In 2025
Private Employment Operating A Luggage Conveyor System For Group Tour, International Passenger Terminal At Phuket Airport. With The Bidding Method Of Electronics (E-Bidding)
Private Employment Operating A Luggage Conveyor System For Group Tour, International Passenger Terminal At Phuket Airport. With The Bidding Method Of Electronics (E-Bidding)
Service of providing construction of oil and chemical pipeline flushing (Chemical flushing) - Kinh Ngu Trang - Kinh Ngu Trang Nam mine development construction project, Lot 09-2/09
Cadangan Kerja-Kerja Penyelenggaraan Landskap, Pembersihan Kawasan Dan Pemotongan Rumput Di Emerald West Ivory, Emerald West Garnet, Emerald West Sapphire, Emerald West Garden, Emerald West Emberly Dan Anggun 1 Dalam Kawasan Majlis Perbandaran Selayang
To Supply, Deliver Oem Plasser & Theurer Spare Parts For (1) Unit Conveyor Wagon
Package No. 35 (Xl09-Csht): Exploiting Mines And Explosives Within The Area Of Lng Quang Trach Thermal Power Plant
Supply Of H225M Helicopter Spares
SUPPLY GOLD COINS FOR RECIPIENTS OF EXCELLENT SERVICE AWARDS AND YOUR SERVICE WILL BE REMEMBERED BY IPOH CITY COUNCIL FOR THE YEAR 2023
S70B Seahawk Helicopter Spares
Supply And Delivery Of One (1) Unit New Wheeled Excavator
Supply Of H225M Helicopter Spares
Package: Supply Of Mining Equipment And Materials, Transportation Equipment For Production In 2025
Mao Covered With Charcoal And Solving The Problem Of 1 Lick Night Coal Conveyor System (1200190030)
Supply and Delivery of New Genuine Caterpillar Engine Spare Parts for 2+1 Years