47 Live Notices for Spain bridges tenders
Showing 1 to 20
Restoration Of The Old Iron Bridge Over The Palmones River
The Execution Of The Work Corresponding To The Pedestrian Crossing Rehabilitation Project On The Madrid To Barcelona Railway Tracks, At Km. 644.3 In The Municipality Of Sitges.
Underwater Works Service, Installation Of Various Floating Pontoons In The Exhibition Grounds And At The Provisional Base Of The Fishing Fleet. Installation Of Bridges And Communication Walkways Between Docks, As Well As General Diver And Seaman Services, For The Celebration Of The Palma International Boat Show 2025.
The Purpose Of This Mixed Contract Is The Supply And Replacement Of 700 Water Meters Out Of A Total Of 2,185 Meters Currently In The Municipality Of Sant Joan Del Es Abadesses, In Accordance With The Project Drawn Up By The Engineer Of Roads, Canals And Bridges, Mr. J. Oriol Martí I Falguera, Approved By Mayoral Decree Number 1,566, Dated August 11, 2023.
Execution Of The Cycling Walkway Project Over The Guadarranque River
Execution Of The Bicycle Walkway Project Over The Guadarranque River
Joint Tender For The Project To Repair Damage To The Ab209 Jorquera (Ab-204) To Alcalá Del Júcar (Cm3201) Road Via La Recueja, Between Pks Pk 0+000 To 14+000, Ab-210, The Section Between Cm-3227 And Ab-209 And Ab-2009: Access (Ab-209) To La Recueja With A Bridge Over The Júcar River, Between Pk 0+000 To 0+200.
Supply Of Walkways For Access To The Beaches Of Santoña.
The Purpose Of This Mixed Contract Is The Supply And Replacement Of 700 Water Meters Out Of A Total Of 2,185 Meters Currently In The Municipality Of Sant Joan Del Es Abadesses, In Accordance With The Project Drawn Up By The Engineer Of Roads, Canals And Bridges, Mr. J. Oriol Martí I Falguera, Approved By Mayoral Decree Number 1,566, Dated August 11, 2023.
Supply And Installation Of A Pedestrian Walkway Over The Service Road Of The N-102 Highway Connecting To The Ibaia Facilities, Within The Framework Of The Recovery, Transformation And Resilience Plan - Financed By The European Union-Nextgenerationeu.
Works To Increase Permeability Between Lugar And Banda, Pedestrian Walkway Over The Iro River (El Castillo) Within The Economic Recovery, Transformation And Resilience Plan. Aid Program For Municipalities For The Implementation Of Low-Emission Zones And Digital And Sustainable Transformation Of Urban Transport, Financed By The Eu With Next Generation Funds.
Project Drafting, Technical Management And Health And Safety Coordination Service For The Project "Pedestrian Bridge To Connect The Paseo Marítimo At The Mouth Of The Rambla Del Cañuelo, Municipality Of Roquetas De Mar (Almería)".
And_46 Conditioning And Enhancement Of The Eastern Section Of Puente Mocho.
Execution Of The Bicycle Walkway Project Over The Guadarranque River
Paving Of Roads And Construction Of 2 Pedestrian Overpasses
Execution Of The Cycling Walkway Project Over The Guadarranque River
Accessibility Improvement Works, Public Elevator And Accessible Walkways Between San Frantzisko Street And The Urazandi Neighborhood In Elgoibar, (Phase 2)
And_46 Conditioning And Enhancement Of The Eastern Section Of Puente Mocho.
01-Gr-2480-Oe Emergency Works For The Structural Rehabilitation Of The Bridge Located At P.K 299+000 Of The A-92 As A Result Of The Damage Caused By The Dana Of October 29, 2024. Tm Guadix (Granada)
Contracting Of Works For Repair Of The Deck And Support Beams Of The Bridge Over The Tuejar River As It Passes Through The Town Of Calles.