1267 Live Notices for Sub-Saharan Africa energy, power and electrical tenders
Showing 1 to 20
Rehabilitation Works Of The Ins Regional Emergency Response Center In Maputo Cit
Supply, delivery, offloading installation and commissioning of battery chargers and batteries, all complete with mild steel enclosures in City of Tshwane substations as and when required over a 3-year period
Provision of technical audit work and supply, install and commission of relays on Tshwane’s transmission and distribution electrical network as and when required over a 3-year period
Service providers to perform installation, inspection, quality control, validation, as well as maintenance tasks of electricity meters in the City of Tshwane (CoT) area of supply for a three-year period, on as and when required basis
SUPPLY OF LAPTOPS AND SWITCHES
PROVISION OF UPS MAINTENANCE SERVICES
DESIGN AND SUPPLY OF THE ESWATINI NATIONAL PETROLEUM COMPANY STRATEGIC FUEL RESERVE FACILITY 3D PHYSICAL ARCHITECTURAL MODEL
SERVICE TO INSTALL THE EARTHING AND LIGHTNING PROTECTION SYSTEM IN KLEREFONTEIN, CARNARVON IN THE NORTHERN CAPE
CONSULTANCY SERVICES (FIRM SELECTION) FOR THE REVIEW OF THE COMPLIANCE MONITORING AND ENFORCEMENT MANAGEMENT FRAMEWORK FOR THE ESWATINI ELECTRICITY SUPPLY INDUSTRY
Procurement of CCTV and Access Controls for NIRA HQs and Enrollment Centers
Acquisition, installation and commissioning of small medical-technical equipment
Electrification work on the AGB cities in Zaken (Saaba) and Kamboinsin (Ouaga) in two (02) lots
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF A HYBIRD SOLAR POWER PV SYSTEM AND ALL ASSOCIATED WORKS
Renovation of UNDP Country Office in Sierra Leone - UNDP - SIERRA LEONE
Design, Supply, Installation, Testing and Commissioning of a 2 MWac Floating Solar Power Plant at Tamarind Falls Reservoir
Provision Of A Car Wash And General Fleet Service For A Period Of 5 Years At Matla Power Station
Provision Of A Maintenance Service Of Firefighting Equipment, Fire Hydrants And Hose Reels And Supply Of Related Spares At Duvha Power Station For A Period Of 36 (Thirty-Six) Months
Supply And Delivery Of Medium Voltage Electrical Cables To Caledon And Villiersdorp Stores From Date Of Appointment Until 30 June 2026
Eskom Requires Solar Pv Frame Members (Supporting Structures) That Are Environmentally Safe, Sustainable And Low Maintenance. These Members Must Be Able To Carry Raised Solar Pv, Providing The Necessary Support And Safety That Will Be Required For The Establishment Of Agrivoltaics Plants For Eskom.
Assessment And Installation Ofalternative Powersupply Backup